{"id":1201,"date":"2025-01-24T17:22:09","date_gmt":"2025-01-24T22:22:09","guid":{"rendered":"https:\/\/akc.com.co\/web\/?p=1201"},"modified":"2025-09-22T17:43:38","modified_gmt":"2025-09-22T22:43:38","slug":"cierre-de-vias","status":"publish","type":"post","link":"https:\/\/akc.com.co\/web\/2025\/01\/24\/cierre-de-vias\/","title":{"rendered":"CIERRE DE V\u00cdAS"},"content":{"rendered":"\n<p style=\"font-style:normal;font-weight:500\">\ud835\udc02\ud835\udc08\ud835\udc04\ud835\udc11\ud835\udc11\ud835\udc04 \ud835\udc03\ud835\udc04 \ud835\udc15\ud835\udc08\u0301\ud835\udc00 \ud835\udc04\ud835\udc0d \ud835\udc0b\ud835\udc00 \ud835\udc00\ud835\udc15\ud835\udc04\ud835\udc0d\ud835\udc08\ud835\udc03\ud835\udc00 2 Y 3 CON CALLE 8 BARRIO LATINO<strong> 07\/09\/2025<\/strong><\/p>\n\n\n\n<p class=\"has-small-font-size\">Aguas Kpital C\u00facuta <a><\/a>S.A.E.S.P., Informa a la comunidad en general del cierre vial que se efectuar\u00e1 en la Avenida 2 y 3 con calle 8 del barrio Latino, el d\u00eda domingo 7 de septiembre a partir de las 7:00 am hasta las 5:00 pm, con el objeto de realizar empalmes de redes de acueducto instaladas en el sector.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Las obras consisten en se\u00f1alizaci\u00f3n, excavaci\u00f3n, conexiones de tuber\u00eda en \u00d84\u201d PVC y rellenos.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Se recomienda a la comunidad en general, tomar rutas alternas, ofrecemos disculpas por las molestias que se puedan generar, trabajamos para construir Ciudad.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Seguimos trabajando con amor por nuestra ciudad.<\/p>\n\n\n\n<p style=\"font-style:normal;font-weight:500\">\ud835\udc02\ud835\udc08\ud835\udc04\ud835\udc11\ud835\udc11\ud835\udc04 \ud835\udc03\ud835\udc04 \ud835\udc15\ud835\udc08\u0301\ud835\udc00 \ud835\udc04\ud835\udc0d \ud835\udc0b\ud835\udc00 \ud835\udc00\ud835\udc15\ud835\udc04\ud835\udc0d\ud835\udc08\ud835\udc03\ud835\udc00 1 CON CALLE 15 BARRIO LA PLAYA<strong> 06\/09\/2025<\/strong><\/p>\n\n\n\n<p class=\"has-small-font-size\">Aguas <a><\/a>Kpital C\u00facuta S.A E.S.P., informa a la comunidad en general, que en la intersecci\u00f3n de la Avenida 1 Calle 15 Barrio La Playa, se realizar\u00e1 cierre total de v\u00eda desde las 7:00 am del d\u00eda 06 de septiembre hasta las 5:00 pm del d\u00eda 07 de septiembre del presente a\u00f1o, con el objeto de realizar trabajos de reposici\u00f3n de tuber\u00eda de acueducto 4\u201d PVC, en una longitud de 20m y 3\u201d PVC en una longitud de 30m, se recomienda atender las recomendaciones viales como se describen a continuaci\u00f3n.<\/p>\n\n\n\n<p class=\"has-small-font-size\">\u2022 Para los veh\u00edculos que circulan en el sentido sur-norte por la avenida 1 cruzar\u00e1n hacia el occidente por la calle 16 hasta la avenida 3.<\/p>\n\n\n\n<p class=\"has-small-font-size\">\u2022 Para los veh\u00edculos que circulan en el sentido oriente- occidente por la calle 16 cruzar\u00e1n hacia el norte por la avenida 3.<\/p>\n\n\n\n<p class=\"has-small-font-size\">\u2022 Para los veh\u00edculos que circulan en el sentido occidente-oriente por la calle 15 cruzar\u00e1n hacia el sur por la avenida 2 hasta la calle 17 y luego llegar a la avenida 0.<\/p>\n\n\n\n<p class=\"has-small-font-size\">\u2022 Para los veh\u00edculos que circulan en el sentido norte-sur por la avenida 2 cruzar\u00e1n hacia el oriente por la calle 17 hasta la avenida 0.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Durante la jornada de trabajo se utilizar\u00e1n se\u00f1ales preventivas e informativas de acuerdo a lo estipulado por el Instituto Nacional de V\u00edas (INVIAS) para la se\u00f1alizaci\u00f3n del \u00e1rea afectada por la obra.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Continuamos haciendo grandes inversiones por el bienestar y desarrollo de la ciudad.<\/p>\n\n\n\n<p>\ud835\udc00<strong>TENCI\u00d3N DE EMERGENCIA POR ROTURA DE TUBER\u00cdA EN ATALAYA 16\/08\/2025<\/strong><\/p>\n\n\n\n<p class=\"has-small-font-size\">Aguas Kpital C\u00facuta informa a la comunidad que el dia de hoy, se present\u00f3 la rotura de una tuber\u00eda de 16 pulgadas de acueducto en la Autopista Atalaya, situaci\u00f3n que oblig\u00f3 a activar de inmediato el plan de contingencia con el despliegue de cuatro cuadrillas, maquinaria especializada y todo el personal disponible.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Con el fin de facilitar los trabajos de reparaci\u00f3n y garantizar la seguridad de la comunidad, fue necesario implementar cierres viales:<\/p>\n\n\n\n<p class=\"has-small-font-size\">\u2022 Cierre total de la Autopista Atalaya en el sentido Zulia\u2013C\u00facuta, desviando los veh\u00edculos por el barrio Atalaya Primera Etapa.<\/p>\n\n\n\n<p class=\"has-small-font-size\">\u2022 En el sentido C\u00facuta\u2013Zulia, se mantiene medio carril habilitado para la circulaci\u00f3n vehicular.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Durante la intervenci\u00f3n, se presenta:<\/p>\n\n\n\n<p class=\"has-small-font-size\">\u2022 Suspensi\u00f3n del servicio de agua potable en: sector 40, barrio Claret, La Primavera y Tucunar\u00e9.<\/p>\n\n\n\n<p class=\"has-small-font-size\">\u2022 Disminuci\u00f3n de presi\u00f3n en los barrios: La Hermita, Camilo Daza, Ospina P\u00e9rez, Buenos Aires y Motilones.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Las labores avanzan de manera prioritaria, con el compromiso que la reparaci\u00f3n quede concluida en el transcurso del d\u00eda, permitiendo la normalizaci\u00f3n progresiva del servicio en todos los sectores.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Asimismo, las autoridades competentes han sido informadas y se mantiene coordinaci\u00f3n constante para garantizar la seguridad, movilidad y atenci\u00f3n integral de la emergencia.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Agradecemos la comprensi\u00f3n y paciencia de nuestros usuarios, reiterando nuestro compromiso de restablecer el servicio con normalidad lo m\u00e1s pronto posible.<\/p>\n\n\n\n<p style=\"font-style:normal;font-weight:500\">\ud835\udc02\ud835\udc08\ud835\udc04\ud835\udc11\ud835\udc11\ud835\udc04 \ud835\udc03\ud835\udc04 \ud835\udc15\ud835\udc08\u0301\ud835\udc00 \ud835\udc04\ud835\udc0d \ud835\udc0b\ud835\udc00 \ud835\udc00\ud835\udc15\ud835\udc04\ud835\udc0d\ud835\udc08\ud835\udc03\ud835\udc00 8 y 9 \ud835\udc02\ud835\udc00\ud835\udc0b\ud835\udc0b\ud835\udc04 \ud835\udfcf\ud835\udfd2 BARRIO EL PARAISO<strong> 05\/08\/2025<\/strong><\/p>\n\n\n\n<p class=\"has-small-font-size\">Aguas Kpital C\u00facuta informa a la ciudadan\u00eda que, con el fin de adelantar trabajos de mantenimiento programados en la red de acueducto, se realizar\u00e1 el cierre total de <a><\/a>la v\u00eda ubicada en la calle 14 entre avenidas 8 y 9 del barrio El Para\u00edso, baja principal Cormoranes, el d\u00eda martes 5 de agosto, en el horario comprendido entre las 7:00 a.m. y las 6:00 p.m.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Agradecemos tomar rutas alternas, as\u00ed como su total comprensi\u00f3n y colaboraci\u00f3n durante la ejecuci\u00f3n de estos trabajos que buscan seguir mejorando la infraestructura de nuestros servicios en la ciudad<\/p>\n\n\n\n<p style=\"font-style:normal;font-weight:500\">\ud835\udc02\ud835\udc08\ud835\udc04\ud835\udc11\ud835\udc11\ud835\udc04 \ud835\udc03\ud835\udc04 \ud835\udc15\ud835\udc08\u0301\ud835\udc00 \ud835\udc04\ud835\udc0d \ud835\udc0b\ud835\udc00 \ud835\udc00\ud835\udc15\ud835\udc04\ud835\udc0d\ud835\udc08\ud835\udc03\ud835\udc00 \ud835\udfcf \ud835\udc02\ud835\udc00\ud835\udc0b\ud835\udc0b\ud835\udc04 \ud835\udfcf\ud835\udfd2-\ud835\udfcf\ud835\udfd3<strong> 02\/08\/2025<\/strong><\/p>\n\n\n\n<p class=\"has-small-font-size\">Aguas Kpital C\u00facuta S.A E.S.P., informa a la comunidad en general, que los d\u00edas 02 y 03 de agosto del presente a\u00f1o, desde las 7:00 am del 02 de agosto hasta las 5:00 pm del 03 de agosto, se realizar\u00e1 cierre total de las intersecciones de la calle 14 Av. 1 y calle 15 Av. 1 barrio La Playa, con el objetivo de ejecutar reposici\u00f3n de tuber\u00eda de alcantarillado 8\u201d PVC en una longitud de 20m y reposici\u00f3n de tuber\u00eda de acueducto 4\u201d en una longitud de 18 m sobre estas intersecciones.<\/p>\n\n\n\n<p class=\"has-small-font-size\">El plan de manejo vial a ejecutar es el siguiente:<\/p>\n\n\n\n<p class=\"has-small-font-size\">\u2022 Para los veh\u00edculos que circulan en el sentido sur- norte por la avenida 1 cruzar\u00e1n hacia el occidente por la calle 16 hasta llegar a la avenida 3.<br>\u2022 Para los veh\u00edculos que circulan en el sentido occidente-oriente por la calle 15 cruzar\u00e1n hacia el sur por la avenida 2 hasta llegar a la calle 17 y luego a la avenida hasta encontrar la avenida 0.<br>\u2022 Para los veh\u00edculos que circulan en el sentido norte-sur por la avenida 0 cruzar\u00e1n hacia el occidente por la calle 16 hasta encontrar la avenida 2.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Durante la jornada de trabajo se utilizar\u00e1n se\u00f1ales preventivas e informativas, de acuerdo a lo estipulado por el Instituto Nacional de V\u00edas (INVIAS) para la se\u00f1alizaci\u00f3n del \u00e1rea afectada por la obra.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Continuamos haciendo grandes inversiones por el bienestar y desarrollo de la ciudad.<\/p>\n\n\n\n<p style=\"font-style:normal;font-weight:500\">\ud835\udc02\ud835\udc08\ud835\udc04\ud835\udc11\ud835\udc11\ud835\udc04 \ud835\udc03\ud835\udc04 \ud835\udc15\ud835\udc08\u0301\ud835\udc00 \ud835\udc00\ud835\udc15\ud835\udc04\ud835\udc0d\ud835\udc08\ud835\udc03\ud835\udc00 \ud835\udc06\ud835\udc11\ud835\udc00\ud835\udc0d \ud835\udc02\ud835\udc0e\ud835\udc0b\ud835\udc0e\ud835\udc0c\ud835\udc01\ud835\udc08\ud835\udc00 \ud835\udc00\ud835\udc15\ud835\udc04\ud835\udc0d\ud835\udc08\ud835\udc03\ud835\udc00 4E \u2013 CALLE 1 AV 3E<strong> 19\/07\/2025<\/strong><\/p>\n\n\n\n<p class=\"has-small-font-size\">Aguas Kpital C\u00facuta S.A E.S.P., informa a la comunidad en general de cierre vial en intersecci\u00f3n de la Avenida Gran Colombia con Avenida 4E l\u00edmite entre los barrios Popular y la Riviera y en la intersecci\u00f3n de la Calle 1 Avenida 3E barrio La Ceiba, durante los d\u00edas 19 y 20 julio desde las 7:00 am hasta las 5:00 pm, con el objeto de realizar empalme de la tuber\u00eda de 20\u201dGRP instalada a la red existente.<\/p>\n\n\n\n<p class=\"has-small-font-size\">El plan de manejo vial a ejecutar es el siguiente:<\/p>\n\n\n\n<p class=\"has-small-font-size\">\u2022 Veh\u00edculos que circulan en el sentido occidente-oriente sobre la avenida Gran Colombia, cruzar hacia el sur por la Avenida 4E hasta la Calle 6, llegando a la Avenida 5E Barrio La Riviera y luego cruzar hacia el norte hasta llegar a la Avenida Gran Colombia.<br>\u2022 Veh\u00edculos que circulan en sentido occidente-oriente sobre la Calle 1 cruzar hacia el norte por la Avenida 3E.<br>\u2022 Veh\u00edculos que circulan en sentido oriente &#8211; occidente sobre la Calle 1 cruzar hacia el sur por la Avenida 4E hasta llegar a la calle 3A.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Durante la jornada de trabajo se utilizar\u00e1n se\u00f1ales preventivas e informativas de acuerdo a lo estipulado por el Instituto Nacional de V\u00edas (INVIAS) para la se\u00f1alizaci\u00f3n del \u00e1rea afectada por la obra. Ofrecemos disculpas por las incomodidades, que se puedan presentar durante la ejecuci\u00f3n de estos trabajos. Continuamos haciendo grandes inversiones por el bienestar y desarrollo de la ciudad.<\/p>\n\n\n\n<p style=\"font-style:normal;font-weight:500\">\ud835\udc02\ud835\udc08\ud835\udc04\ud835\udc11\ud835\udc11\ud835\udc04 \ud835\udc03\ud835\udc04 \ud835\udc15\ud835\udc08\u0301\ud835\udc00 \ud835\udc00\ud835\udc15\ud835\udc04\ud835\udc0d\ud835\udc08\ud835\udc03\ud835\udc00 \ud835\udc06\ud835\udc11\ud835\udc00\ud835\udc0d \ud835\udc02\ud835\udc0e\ud835\udc0b\ud835\udc0e\ud835\udc0c\ud835\udc01\ud835\udc08\ud835\udc00 \ud835\udc00\ud835\udc15\ud835\udc04\ud835\udc0d\ud835\udc08\ud835\udc03\ud835\udc00 \ud835\udfd2\ud835\udc04 &#8211;<strong> 27\/06\/2025<\/strong><\/p>\n\n\n\n<p class=\"has-small-font-size\">Aguas Kpital C\u00facuta S.A E.S.P. informa a la comunidad en general, de los trabajos de reposici\u00f3n de tuber\u00eda de acueducto 20\u201d GRP en una longitud de 36m, que se ejecutar\u00e1n en la intersecci\u00f3n de la Avenida Gran Colombia con Avenida 4E l\u00edmite entre los barrios Popular y la Riviera, por lo cual se realizar\u00e1 cierre total desde las 7:00 am del d\u00eda 28 de junio hasta las 5.00 pm del d\u00eda 30 de junio del presente a\u00f1o.<\/p>\n\n\n\n<p class=\"has-small-font-size\">El plan de manejo vial a ejecutar es el siguiente:<\/p>\n\n\n\n<p class=\"has-small-font-size\">\u2022 Para los veh\u00edculos que circulan en el sentido oriente-occidente cruzar\u00e1n hacia el norte por la avenida 5E hasta la Calle 7 y llegar\u00e1n a la Avenida 4E Barrio Popular y luego cruzar\u00e1n hacia el sur hasta llegar a la avenida Gran Colombia.<\/p>\n\n\n\n<p class=\"has-small-font-size\">\u2022 Para los veh\u00edculos que circulan en el sentido occidente-oriente cruzar\u00e1n hacia el sur por la avenida 4E hasta la Calle 6 y llegar\u00e1n a la Avenida 5E Barrio La Riviera y luego cruzar\u00e1n hacia el norte hasta llegar a la avenida Gran Colombia.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Durante la jornada de trabajo se utilizar\u00e1n se\u00f1ales preventivas e informativas de acuerdo a lo estipulado por el Instituto Nacional de V\u00edas (INVIAS) para la se\u00f1alizaci\u00f3n del \u00e1rea afectada por la obra. Ofrecemos disculpas por las incomodidades, que se puedan presentar durante la ejecuci\u00f3n de estos trabajos.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Continuamos haciendo grandes inversiones por el bienestar y desarrollo de la ciudad.<\/p>\n\n\n\n<p style=\"font-style:normal;font-weight:500\">\ud835\udc02\ud835\udc08\ud835\udc04\ud835\udc11\ud835\udc11\ud835\udc04 \ud835\udc03\ud835\udc04 \ud835\udc15\ud835\udc08\ud835\udc00 \ud835\udc04\ud835\udc0d \ud835\udc0b\ud835\udc00 \ud835\udc00\ud835\udc15\ud835\udc04\ud835\udc0d\ud835\udc08\ud835\udc03\ud835\udc00 4 \ud835\udc02\ud835\udc00\ud835\udc0b\ud835\udc0b\ud835\udc04 5 BARRIO LATINO &#8211;<strong> 14\/06\/2025<\/strong><\/p>\n\n\n\n<p class=\"has-small-font-size\">Aguas Kpital C\u00facuta S.A.E.S.P., Informa a la comunidad en general del cierre vial que se efectuar\u00e1 en la Avenida 4 con Cl 5 del barrio Latino, el d\u00eda s\u00e1bado 14 de junio a partir de las 7:00 am hasta las 5:00 pm, con el objeto de realizar empalmes de redes de acueducto instaladas en el sector.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Las obras consisten en se\u00f1alizaci\u00f3n, excavaci\u00f3n, conexiones de tuber\u00eda en \u00d84\u201d PVC y rellenos.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Se recomienda a la comunidad en general tomar rutas alternas, continuamos trabajando para construir una mejor Ciudad.<\/p>\n\n\n\n<p style=\"font-style:normal;font-weight:500\">\ud835\udc02\ud835\udc08\ud835\udc04\ud835\udc11\ud835\udc11\ud835\udc04 \ud835\udc03\ud835\udc04 \ud835\udc15\ud835\udc08\ud835\udc00 \ud835\udc04\ud835\udc0d \ud835\udc0b\ud835\udc00 \ud835\udc00\ud835\udc15\ud835\udc04\ud835\udc0d\ud835\udc08\ud835\udc03\ud835\udc00 \ud835\udfcf \ud835\udc02\ud835\udc00\ud835\udc0b\ud835\udc0b\ud835\udc04 \ud835\udfcf\ud835\udfd4-\ud835\udfcf\ud835\udfd5 &#8211;<strong> 17\/05\/2025<\/strong><\/p>\n\n\n\n<p class=\"has-small-font-size\">Aguas Kpital C\u00facuta S.A E.S.P., informa a la comunidad en general, sobre los trabajos de reposici\u00f3n de tuber\u00eda de alcantarillado 16\u201d PVC en una longitud de 20m, que se ejecutar\u00e1n en la intersecci\u00f3n de la Avenida 1 Calle 16 Barrio La Playa y Avenida 1 Calle 17 Barrio Blanco y por los cuales se realizar\u00e1 cierre total desde las 7:00 am del d\u00eda 17 de mayo hasta las 5:00 pm del d\u00eda 18 de mayo del presente a\u00f1o.<br>El plan de manejo vial a ejecutar es el siguiente:<br>\u2022 Para los veh\u00edculos que circulan en el sentido sur-norte por la avenida 1 habr\u00e1 disminuci\u00f3n a un carril.<br>\u2022 Para los veh\u00edculos que circulan en el sentido oriente &#8211; occidente por la calle 16 cruzar\u00e1n hacia el sur por la avenida 0 hasta la Calle 18 y luego llegar a la avenida 1.<br>\u2022 Para los veh\u00edculos que circulan en el sentido occidente-oriente por la calle 17 cruzar\u00e1n hacia el norte por la avenida 1 hasta la calle 15 y luego llegar a la avenida 0.<br>\u2022 Para los veh\u00edculos que circulan en el sentido norte &#8211; sur por la avenida 0 cruzar\u00e1n hacia el occidente por la Calle 18 y luego llegar a la avenida 1.<br>Durante la jornada de trabajo se utilizar\u00e1n se\u00f1ales preventivas e informativas de acuerdo a lo estipulado por el Instituto Nacional de V\u00edas (INVIAS) para la se\u00f1alizaci\u00f3n del \u00e1rea afectada por la obra.<br>Ofrecemos disculpas por las incomodidades, que se puedan presentar durante la ejecuci\u00f3n de estos trabajos. Continuamos haciendo grandes inversiones por el bienestar y desarrollo de la ciudad.<\/p>\n\n\n\n<p style=\"font-style:normal;font-weight:500\">\ud835\udc02\ud835\udc08\ud835\udc04\ud835\udc11\ud835\udc11\ud835\udc04 \ud835\udc03\ud835\udc04 \ud835\udc15\ud835\udc08\ud835\udc00 \ud835\udc00\ud835\udc15\ud835\udc04\ud835\udc0d\ud835\udc08\ud835\udc03\ud835\udc00 \ud835\udfcf \ud835\udc02\ud835\udc00\ud835\udc0b\ud835\udc0b\ud835\udc04 \ud835\udfcf\ud835\udfd3 &#8211;<strong> 3\/05\/2025<\/strong><\/p>\n\n\n\n<p class=\"has-small-font-size\">Aguas Kpital C\u00facuta S.A E.S.P., informa a la <a><\/a>comunidad en general, que llevar\u00e1 a cabo trabajos de reposici\u00f3n de tuber\u00eda de alcantarillado 16\u201d PVC en una longitud de 15m, en la intersecci\u00f3n de la Avenida 1 Calle 15 Barrio La Playa; para lo que se har\u00e1 necesario cierre total desde las 7:00 am del d\u00eda 03 de mayo hasta las 5:00 pm del d\u00eda 04 de mayo del presente a\u00f1o.<\/p>\n\n\n\n<p class=\"has-small-font-size\">El plan de manejo vial a ejecutar ser\u00e1 as\u00ed:<\/p>\n\n\n\n<p class=\"has-small-font-size\">&#8211; Para los veh\u00edculos que circulan en el sentido sur-norte por la avenida 1 cruzar\u00e1n hacia el occidente por la calle 16 hasta la avenida 3.<\/p>\n\n\n\n<p class=\"has-small-font-size\">&#8211; Para los veh\u00edculos que circulan en el sentido oriente- occidente por la calle 16 cruzar\u00e1n hacia el norte por la avenida 3.<\/p>\n\n\n\n<p class=\"has-small-font-size\">&#8211; Para los veh\u00edculos que circulan en el sentido occidente-oriente por la calle 15 cruzar\u00e1n hacia el sur por la avenida 2 hasta la calle 17 y luego llegar a la avenida 0.<\/p>\n\n\n\n<p class=\"has-small-font-size\">&#8211; Para los veh\u00edculos que circulan en el sentido norte-sur por la avenida 2 cruzar\u00e1n hacia el oriente por la calle 17 hasta la avenida 0.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Durante la jornada de trabajo se utilizar\u00e1n se\u00f1ales preventivas e informativas de acuerdo a lo estipulado por el Instituto Nacional de V\u00edas (INVIAS) para la se\u00f1alizaci\u00f3n del \u00e1rea afectada por la obra.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Ofrecemos disculpas por las incomodidades, que se puedan presentar durante la ejecuci\u00f3n de estos trabajos. Continuamos haciendo grandes inversiones por el bienestar y desarrollo de la ciudad.<\/p>\n\n\n\n<p style=\"font-style:normal;font-weight:500\">\ud835\udc02\ud835\udc08\ud835\udc04\ud835\udc11\ud835\udc11\ud835\udc04 \ud835\udc03\ud835\udc04 \ud835\udc15\ud835\udc08\ud835\udc00 \ud835\udc04\ud835\udc0d \ud835\udc0b\ud835\udc00 \ud835\udc00\ud835\udc15\ud835\udc04\ud835\udc0d\ud835\udc08\ud835\udc03\ud835\udc00 \ud835\udfce \ud835\udc02\ud835\udc00\ud835\udc0b\ud835\udc0b\ud835\udc04 \ud835\udfcf\ud835\udfd2 &#8211; <strong>26\/04\/2025<\/strong><\/p>\n\n\n\n<p class=\"has-small-font-size\">Aguas Kpital C\u00facuta S.A E.S.P., informa a la comunidad en general, que entre los d\u00edas 26 y 27 de abril del presente a\u00f1o, desde las 7:00 am del 26 de abril hasta las 5:00 pm del d\u00eda 27 de abril, se realizar\u00e1 cierre total de la intersecci\u00f3n de la Avenida Libertadores y Avenida canal Bogot\u00e1 barrio Zulima, con el objetivo de ejecutar reposici\u00f3n de tuber\u00eda de alcantarillado 16\u201d PVC sobre esta intersecci\u00f3n.<\/p>\n\n\n\n<p class=\"has-small-font-size\">El plan de manejo vial a ejecutar es el siguiente:<\/p>\n\n\n\n<p class=\"has-small-font-size\">\u2022 Para los veh\u00edculos que circulan en el sentido sur- norte por la avenida 11E seguir\u00e1n derecho hasta la Avenida 1 Calle 20N Prados Norte y cruzar\u00e1n a la derecha y encontrar la Avenida Libertadores.<br>\u2022 Para los veh\u00edculos que circulan en el sentido norte-sur por la Avenida Libertadores tendr\u00e1n reducci\u00f3n a un carril en la intersecci\u00f3n de la Avenida Libertadores y Avenida canal Bogot\u00e1.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Durante la jornada de trabajo se utilizar\u00e1n se\u00f1ales preventivas e informativas, de acuerdo a lo estipulado por el Instituto Nacional de V\u00edas (INVIAS) para la se\u00f1alizaci\u00f3n del \u00e1rea afectada por la obra. Ofrecemos disculpas por las incomodidades que se puedan presentar durante la ejecuci\u00f3n de estos trabajos.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Continuamos haciendo grandes inversiones por el bienestar y desarrollo de la ciudad.<\/p>\n\n\n\n<p style=\"font-style:normal;font-weight:500\">\ud835\udc02\ud835\udc08\ud835\udc04\ud835\udc11\ud835\udc11\ud835\udc04 \ud835\udc03\ud835\udc04 \ud835\udc15\ud835\udc08\ud835\udc00 \ud835\udc04\ud835\udc0d \ud835\udc0b\ud835\udc00 \ud835\udc00\ud835\udc15\ud835\udc04\ud835\udc0d\ud835\udc08\ud835\udc03\ud835\udc00 \ud835\udfce \ud835\udc02\ud835\udc00\ud835\udc0b\ud835\udc0b\ud835\udc04 \ud835\udfcf\ud835\udfd2 &#8211; <strong>5\/04\/2025<\/strong><\/p>\n\n\n\n<p>Aguas Kpital C\u00facuta S.A E.S.P., informa a la comunidad en general de cierre vial los d\u00edas 5 y 6 de abril en el horario 7:00 am a 5:00 pm, en la Avenida 0 Calle 14 Barrio La Playa con el objeto de realizar reposici\u00f3n de tuber\u00eda de alcantarillado 18\u201d PVC en una longitud de 18m.<\/p>\n\n\n\n<p class=\"has-small-font-size\">El plan de manejo vial a ejecutar es el siguiente:<\/p>\n\n\n\n<p class=\"has-small-font-size\">\u2022 Para los veh\u00edculos que circulan en el sentido sur-norte cruzar\u00e1n hacia el oriente por la calle 15 hasta la avenida 2E y llegar\u00e1n a la calle 13 y luego cruzar\u00e1n hacia el occidente hasta llegar a la avenida 0.<\/p>\n\n\n\n<p class=\"has-small-font-size\">\u2022 Para los veh\u00edculos que circulan en el sentido norte-sur cruzar\u00e1n hacia el occidente por la calle 12 hasta la avenida 2 y llegar\u00e1n a la calle 13 y luego cruzar\u00e1n hacia el oriente hasta llegar a la avenida 0.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Durante la jornada de trabajo se utilizar\u00e1n se\u00f1ales preventivas e informativas de acuerdo a lo estipulado por el Instituto Nacional de V\u00edas (INVIAS) para la se\u00f1alizaci\u00f3n del \u00e1rea afectada por la obra. Ofrecemos disculpas por las incomodidades, que se puedan presentar durante la ejecuci\u00f3n de los trabajos.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Continuamos haciendo grandes inversiones por el bienestar y desarrollo de la ciudad.<\/p>\n\n\n\n<h2 class=\"has-medium-font-size\" style=\"font-style:normal;font-weight:500\">CIERRE VIAL PARA RECUPERACI\u00d3N DE LA VIA, EN LA AV LIBERTADORES POR EL BARRIO LOS PR\u00d3CERES.\u2013 27\/02\/2025<\/h2>\n\n\n\n<p class=\"has-small-font-size\">Aguas Kpital C\u00facuta S.A.E.S.P., Informa a la comunidad en general del cierre vial que se efectuar\u00e1 en la Avenida Libertadores entre el Colegio Mercedes Abrego y la Calle 9B barrio Los Pr\u00f3ceres, a partir del d\u00eda hoy 27 de febrero desde las 8:00 pm hasta las 12:00 pm del d\u00eda 28 de febrero, con el objeto de realizar la recuperaci\u00f3n de la V\u00eda intervenida por emergencia sanitaria entre el 11 y 14 de febrero.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Se recomienda a la comunidad en general, tomar rutas alternas atendiendo a la se\u00f1alizaci\u00f3n dispuesta en la v\u00eda, ofrecemos disculpas por las molestias que se puedan generar, trabajamos para construir ciudad.<\/p>\n\n\n\n<p style=\"font-style:normal;font-weight:500\">\ud835\udc02\ud835\udc08\ud835\udc04\ud835\udc11\ud835\udc11\ud835\udc04 \ud835\udc03\ud835\udc04 \ud835\udc15\ud835\udc08\ud835\udc00 \ud835\udc04\ud835\udc0d \ud835\udc0b\ud835\udc00 \ud835\udc00\ud835\udc15\ud835\udc04\ud835\udc0d\ud835\udc08\ud835\udc03\ud835\udc00 \ud835\udfd0 \ud835\udc02\ud835\udc00\ud835\udc0b\ud835\udc0b\ud835\udc04 \ud835\udfcf\ud835\udfd6 \u2013 22\/02\/2025<\/p>\n\n\n\n<p class=\"has-small-font-size\">Aguas Kpital C\u00facuta S.A E.S.P., informa a la comunidad en general, que entre los d\u00edas 22 y 23 de febrero del presente a\u00f1o. Desde las 7:00 am del 22 de febrero hasta las 5:00 pm del d\u00eda 23 de febrero, se realizar\u00e1 cierre total de la calle 18 entre Av. 1 y Av. 2 incluyendo la intersecci\u00f3n con la Avenida 2, barrio Blanco, con el objetivo de ejecutar reposici\u00f3n de tuber\u00eda de alcantarillado 24\u201d PVC en una longitud de 15m sobre esta intersecci\u00f3n.<\/p>\n\n\n\n<p class=\"has-small-font-size\">El plan de manejo vial a ejecutar es el siguiente:<\/p>\n\n\n\n<p class=\"has-small-font-size\">\u2022 Para los veh\u00edculos que circulan en el sentido norte- sur cruzar\u00e1n hacia el oriente por la calle 17 hasta llegar a la avenida 0.<br>\u2022 Para los veh\u00edculos que circulan en el sentido oriente-occidente por la calle 18 cruzar\u00e1n hacia el norte por la avenida 1 hasta llegar a la calle 16.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Durante la jornada de trabajo se utilizar\u00e1n se\u00f1ales preventivas e informativas, de acuerdo a lo estipulado por el Instituto Nacional de V\u00edas (INVIAS) para la se\u00f1alizaci\u00f3n del \u00e1rea afectada por la obra. Ofrecemos disculpas por las incomodidades que se puedan presentar durante la ejecuci\u00f3n de estos trabajos. Continuamos haciendo grandes inversiones por el bienestar y desarrollo de la ciudad.<\/p>\n\n\n\n<h2 class=\"has-medium-font-size\" style=\"font-style:normal;font-weight:500;text-transform:uppercase\">\ud835\udc02\ud835\udc08\ud835\udc04\ud835\udc11\ud835\udc11\ud835\udc04 \ud835\udc03\ud835\udc04 \ud835\udc15\ud835\udc08\ud835\udc00 \ud835\udc04\ud835\udc0d \ud835\udc0b\ud835\udc00 \ud835\udc00\ud835\udc15\ud835\udc04\ud835\udc0d\ud835\udc08\ud835\udc03\ud835\udc00 \ud835\udc0b\ud835\udc08\ud835\udc01\ud835\udc04\ud835\udc11\ud835\udc13\ud835\udc00\ud835\udc03\ud835\udc0e\ud835\udc11\ud835\udc04\ud835\udc12 \ud835\udc04\ud835\udc0d\ud835\udc13\ud835\udc11\ud835\udc04 \ud835\udc04\ud835\udc0b \ud835\udc02\ud835\udc0e\ud835\udc0b\ud835\udc04\ud835\udc06\ud835\udc08\ud835\udc0e \ud835\udc0c\ud835\udc04\ud835\udc11\ud835\udc02\ud835\udc04\ud835\udc03\ud835\udc04\ud835\udc12 \ud835\udc00\u0301\ud835\udc01\ud835\udc11\ud835\udc04\ud835\udc06\ud835\udc0e \ud835\udc18 \ud835\udc0b\ud835\udc00 \ud835\udc02\ud835\udc00\ud835\udc0b\ud835\udc0b\ud835\udc04 \ud835\udfd7\ud835\udc01 \ud835\udc01\ud835\udc00\ud835\udc11\ud835\udc11\ud835\udc08\ud835\udc0e \ud835\udc0b\ud835\udc0e\ud835\udc12 \ud835\udc0f\ud835\udc11\ud835\udc0e\u0301\ud835\udc02\ud835\udc04\ud835\udc11\ud835\udc04\ud835\udc12. &#8211; 11\/02\/2025<\/h2>\n\n\n\n<p class=\"has-small-font-size\">Aguas Kpital C\u00facuta S.A. E.S.P., Informa a la comunidad en general del cierre vial que se efectuar\u00e1 en la Avenida Libertadores entre el Colegio Mercedes \u00c1brego y la Calle 9B barrio Los Pr\u00f3ceres, a partir del d\u00eda 11 de febrero al 14 de febrero, en atenci\u00f3n a emergencia Sanitaria para reposici\u00f3n de red de alcantarillado sanitario que colapso afectando el servicio de la zona.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Las obras consisten en excavaciones, se\u00f1alizaci\u00f3n, reposici\u00f3n de tuber\u00eda en 10 pulgadas de PVC y rellenos, la recuperaci\u00f3n se programar\u00e1 posterior a la intervenci\u00f3n de emergencia.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Se recomienda a la comunidad en general, tomar rutas alternas, seguimos trabajando para construir una mejor Ciudad.<\/p>\n\n\n\n<h2 class=\"has-medium-font-size\" style=\"font-style:normal;font-weight:500;text-transform:uppercase\">\ud835\udc02\ud835\udc08\ud835\udc04\ud835\udc11\ud835\udc11\ud835\udc04 \ud835\udc03\ud835\udc04 \ud835\udc15\ud835\udc08\ud835\udc00 \ud835\udc04\ud835\udc0d \ud835\udc0b\ud835\udc00 \ud835\udc00\ud835\udc15\ud835\udc04\ud835\udc0d\ud835\udc08\ud835\udc03\ud835\udc00 \ud835\udfcf \ud835\udc02\ud835\udc00\ud835\udc0b\ud835\udc0b\ud835\udc04 \ud835\udfcf\ud835\udfd6 &#8211; 06\/02\/2025<\/h2>\n\n\n\n<p class=\"has-small-font-size\">Aguas Kpital C\u00facuta S.A E.S.P., informa a la comunidad en general, que entre los d\u00edas 6, 7 y 8 de febrero del presente a\u00f1o, desde las 7:00 am del 6 de febrero hasta las 5:00 pm del d\u00eda 8 de febrero, se realizar\u00e1 cierre total de v\u00eda para ejecutar reposici\u00f3n de tuber\u00eda de alcantarillado 24\u201d PVC en una longitud de 18m, <a><\/a>sobre la intersecci\u00f3n de la Avenida 1 Calle 18 Barrio Blanco, se recomienda tomar rutas alternas.<\/p>\n\n\n\n<p class=\"has-small-font-size\">El plan de manejo vial a ejecutar es el siguiente:<\/p>\n\n\n\n<p class=\"has-small-font-size\">Ofrecemos disculpas por las incomodidades, que se puedan presentar durante la ejecuci\u00f3n de estos trabajos. Continuamos haciendo grandes inversiones por el bienestar y desarrollo de la ciudad.<\/p>\n\n\n\n<p class=\"has-small-font-size\">\u2022 Para los veh\u00edculos que circulan en el sentido sur-norte cruzar\u00e1n hacia el oriente por la calle 19 hasta llegar a la avenida 0.<\/p>\n\n\n\n<p class=\"has-small-font-size\">\u2022 Para los veh\u00edculos que circulan en el sentido norte-sur cruzar\u00e1n hacia el occidente por la calle 20 hasta llegar a la avenida 3.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Durante la jornada de trabajo se utilizar\u00e1n se\u00f1ales preventivas e informativas de acuerdo a lo estipulado por el Instituto Nacional de V\u00edas (INVIAS) para la se\u00f1alizaci\u00f3n del \u00e1rea afectada por la obra.<\/p>\n\n\n\n<h2 class=\"has-medium-font-size\" style=\"font-style:normal;font-weight:500;text-transform:uppercase\">\ud835\udc02\ud835\udc08\ud835\udc04\ud835\udc11\ud835\udc11\ud835\udc04 \ud835\udc03\ud835\udc04 \ud835\udc15\ud835\udc08\ud835\udc00 \ud835\udc00\ud835\udc15\ud835\udc04\ud835\udc0d\ud835\udc08\ud835\udc03\ud835\udc00 \ud835\udfce \ud835\udc02\ud835\udc00\ud835\udc0b\ud835\udc0b\ud835\udc04 \ud835\udfcf\ud835\udfd6 \ud835\udc03\ud835\udc04 \ud835\udc01\ud835\udc00\ud835\udc11\ud835\udc11\ud835\udc08\ud835\udc0e \ud835\udc01\ud835\udc0b\ud835\udc00\ud835\udc0d\ud835\udc02\ud835\udc0e- 25\/01\/2025<\/h2>\n\n\n\n<p class=\"has-small-font-size\">Aguas Kpital C\u00facuta S.A E.S.P., informa a la comunidad en general, que entre los d\u00edas 25 y 26 de enero del presente a\u00f1o, en horario de 7:00 am hasta las 5.00 pm, se realizar\u00e1 cierre total de v\u00eda para ejecutar reposici\u00f3n de tuber\u00eda de alcantarillado 24\u201d PVC en una longitud de 17m, sobre la intersecci\u00f3n de la Avenida 0 Calle 18 Barrio Blanco, se recomienda tomar <a><\/a>rutas alternas.<\/p>\n\n\n\n<p class=\"has-small-font-size\">El plan de manejo vial a ejecutar es el siguiente:<\/p>\n\n\n\n<p class=\"has-small-font-size\">\u2022 Para los veh\u00edculos que circulan en el sentido sur-norte cruzar\u00e1n hacia el occidente por la calle 20 hasta la avenida 1 y llegar\u00e1n a la calle 17 y luego cruzar\u00e1n hacia el oriente hasta llegar a la avenida 0.<\/p>\n\n\n\n<p class=\"has-small-font-size\">\u2022 Para los veh\u00edculos que circulan en el sentido norte-sur cruzar\u00e1n hacia el occidente por la calle 16 hasta la avenida 2A y llegar\u00e1n a la calle 19 y luego cruzar\u00e1n hacia el oriente hasta llegar a la avenida 0.<\/p>\n\n\n\n<p class=\"has-small-font-size\">\u2022 Para los veh\u00edculos que vienen desde la avenida libertadores por la calle 18 hacia la avenida 0 cruzar\u00e1n hacia el sur por la Avenida 0E hasta la calle 20 y luego cruzar\u00e1n al occidente hasta llegar a la avenida 0.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Durante la jornada de trabajo se utilizar\u00e1n se\u00f1ales preventivas e informativas de acuerdo a lo estipulado por el Instituto Nacional de V\u00edas (INVIAS) para la se\u00f1alizaci\u00f3n del \u00e1rea afectada por la obra.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Ofrecemos disculpas por las incomodidades, que se puedan presentar durante la ejecuci\u00f3n de estos trabajos. Continuamos haciendo grandes inversiones por el bienestar y desarrollo de la ciudad.<\/p>\n\n\n\n<h2 class=\"has-medium-font-size\" style=\"font-style:normal;font-weight:500;text-transform:uppercase\">CIERRE DE VIAS Cl 13A entre Cl.13 y Av. 4 Este detr\u00e1s de Homecenter- 16\/7\/2024<\/h2>\n\n\n\n<p class=\"has-small-font-size\">\ud835\udc00\ud835\udc06\ud835\udc14\ud835\udc00\ud835\udc12 \ud835\udc0a\ud835\udc0f\ud835\udc08\ud835\udc13\ud835\udc00\ud835\udc0b \ud835\udc02\u00da\ud835\udc02\ud835\udc14\ud835\udc13\ud835\udc00 S.A E.S.P informa a la ciudadan\u00eda en general que desde el d\u00eda martes 16 al s\u00e1bado 20 de julio en el horario de 7:00 am \u2013 10:00 pm, se proyectan obras en la Cl 13A entre Cl.13 y Av. 4 Este detr\u00e1s de Homecenter, en el sentido que conduce de La Avenida Libertadores hacia el centro.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Esta intervenci\u00f3n se proyecta con cierre total de v\u00eda, con el objeto de realizar instalaci\u00f3n de alcantarillado sanitario en tuber\u00eda \u00d812\u201d PVC.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Al finalizar las actividades se habilita la v\u00eda al tr\u00e1nsito vehicular, se agradece a la comunidad en general tomar rutas alternas antes de los respectivos cierres, atendiendo a las se\u00f1ales dispuestas en la v\u00eda.<\/p>\n\n\n\n<h2 class=\"has-medium-font-size\" style=\"font-style:normal;font-weight:500\">CIERRE DE VIAS CRUCE DIAGONAL SANTANDER- 12\/5\/2024<\/h2>\n\n\n\n<p class=\"has-small-font-size\">Aguas Kpital C\u00facuta S.A. E.S.P informa a la comunidad en general, que el Domingo 12 de mayo de 7:00 a.m. a 3:00 p.m., se llevar\u00e1 a cabo una intervenci\u00f3n para realizar recuperaci\u00f3n de la v\u00eda en el cruce de la Diagonal Santander, sentido C\u00facuta &#8211; Villa del Rosario.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Agradecemos por favor a toda la ciudadan\u00eda tomar las rutas alternas y atender la se\u00f1alizaci\u00f3n dispuesta.<\/p>\n\n\n\n<h2 class=\"has-medium-font-size\" style=\"font-style:normal;font-weight:500\">CIERRE DE VIAS CLL. 6 AV. 18 Y 19 &#8211; BARRIO 28 FEBRERO &#8211; 29\/4\/2024 AL 30\/4\/2024<\/h2>\n\n\n\n<p class=\"has-small-font-size\">Se proyecta realizar el cierre de la doble calzada de la calle 6, entre las avenidas 18 y 19 del barrio 28 de Febrero, debido a la reparaci\u00f3n de la tuber\u00eda 24 pulgadas, ubicada a la salida del tanque 28 Febrero, (M\u00e1s conocido como la subida de la Loma de Bol\u00edvar). Con el objetivo de minimizar los contratiempos que puedan surgir, este cierre se llevar\u00e1 a cabo en horario nocturno, dando inicio el lunes 29 de abril a las 9:00 pm y concluyendo el martes 30 de abril a las 5:00 am.Recuerde tomar v\u00edas de desplazamiento alternas, durante este cierre.<\/p>\n\n\n\n<h2 class=\"has-medium-font-size\" style=\"font-style:normal;font-weight:500\">CIERRE DE VIAS AV. CAMILO DAZA &#8211; BARRIO PANAMERICANO &#8211; 15\/4\/2024 AL 29\/4\/2024<\/h2>\n\n\n\n<p class=\"has-small-font-size\">Informamos que a partir del d\u00eda 15 de abril al 29 de abril en el horario de 7:00 am a 5:30 pm, se proyecta cierre de un carril en la Av.2 entre Avenida Camilo Daza y Cl 6 del Barrio Panamericano, intervenci\u00f3n que se efect\u00faa con el objeto de realizar reposici\u00f3n de red de acueducto de 16\u201d.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Se recomienda tomar ruta alterna a la derecha por la Av. 12 del Barrio Panamericano, retornar a la Av. 2 del Aeropuerto por la Cl 6.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Al finalizar la jornada se habilitar\u00e1 la v\u00eda al tr\u00e1nsito vehicular, se agradece a la comunidad en general tomar rutas alternas antes de los respectivos cierres, atendiendo a las se\u00f1ales dispuestas en la V\u00eda.<\/p>\n\n\n\n<h2 class=\"has-medium-font-size\" style=\"font-style:normal;font-weight:500\">CIERRE DE VIAS DIAG. SANTANDER FRENTE A HOMECENTER &#8211; 8\/4\/2024 Y 19\/4\/2024<\/h2>\n\n\n\n<p class=\"has-small-font-size\">Informamos a la comunidad que se llevar\u00e1 a cabo el cierre de v\u00edas en la Diagonal Santander, frente a Homecenter, con el fin de realizar importantes obras. Este cierre se efectuar\u00e1 desde el lunes 8 de abril hasta el 19 de abril, en el horario de 8:00 p.m. a 5:00 a.m.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Durante este per\u00edodo, se realizar\u00e1n excavaciones y movimientos importantes de tierra. Adem\u00e1s, el d\u00eda martes se continuar\u00e1 la jornada de 7:00 a.m. a 5:00 p.m. con la instalaci\u00f3n de tuber\u00edas y rellenos. Es relevante destacar que durante las horas diurnas se mantendr\u00e1n habilitados dos carriles, mientras que en las nocturnas solo estar\u00e1 disponible un carril.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Se solicita a los usuarios tomar rutas alternas y prestar atenci\u00f3n a la se\u00f1alizaci\u00f3n correspondiente.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Agradecemos de antemano su comprensi\u00f3n y colaboraci\u00f3n.<\/p>\n\n\n\n<h2 class=\"has-medium-font-size\" style=\"font-style:normal;font-weight:500\">CIERRE DE VIAS DIAG. SANTANDER FRENTE A HOMECENTER &#8211; 6\/4\/2024 Y 7\/4\/2024<\/h2>\n\n\n\n<p class=\"has-small-font-size\">Informamos a la comunidad en general sobre el cierre programado de v\u00edas en la Diagonal Santander, frente a Homecenter, con el prop\u00f3sito de llevar a cabo obras de importancia. Este cierre se llevar\u00e1 a cabo el S\u00e1bado 6 de abril, desde las 8:00 p. m. hasta las 5:00 a. m. del domingo 7 de abril.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Los trabajos a realizar comprenden la reposici\u00f3n del alcantarillado sanitario de 16 pulgadas, adem\u00e1s de cortes, demolici\u00f3n, excavaci\u00f3n y rellenos. Estas labores se llevar\u00e1n a cabo en jornadas dobles, con una duraci\u00f3n de 22 horas al d\u00eda.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Se solicita a los ciudadanos tomar rutas alternas y prestar atenci\u00f3n a la se\u00f1alizaci\u00f3n dispuesta, sugiriendo hacer retorno en Corponor hacia la Diagonal Santander.<\/p>\n\n\n\n<p class=\"has-small-font-size\">En caso de ser necesario, se contempla la posibilidad de extender la jornada del domingo para garantizar la habilitaci\u00f3n completa de la v\u00eda.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Agradecemos sinceramente su comprensi\u00f3n y colaboraci\u00f3n durante este proceso.<\/p>\n\n\n\n<h2 class=\"has-medium-font-size\" style=\"font-style:normal;font-weight:500\">CIERRE DE VIAS DIAG. SANTANDER CON AV. 5E- 24\/3\/2024 Y 25\/3\/2024<\/h2>\n\n\n\n<p class=\"has-small-font-size\">Informamos que el d\u00eda domingo 24 y el d\u00eda lunes festivo 25 de marzo en el horario de 7:00 am \u2013 6:00 pm, se ejecutar\u00e1n obras en la Diagonal Santander con Av. 5E frente al concesionario de veh\u00edculos Nissan, intervenci\u00f3n se proyecta con cierres parciales reducci\u00f3n a un carril, con el objeto de realizar instalaci\u00f3n de alcantarillado sanitario en tuber\u00eda \u00d818\u201d PVC.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Al finalizar las actividades se habilita la v\u00eda al tr\u00e1nsito vehicular. Se agradece a la comunidad en general tomar rutas alternas antes de los respectivos cierres, atendiendo a las se\u00f1ales dispuestas en la V\u00eda.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Los cierres se plantean en 4 etapas:<\/p>\n\n\n\n<p class=\"has-small-font-size\">&#8211; Cierre de carril derecho, Diagonal Santander en el sentido San Mateo \u2013 Centro, Domingo 24 a partir de las 07:00 am\u2013 1:00 pm.<\/p>\n\n\n\n<p class=\"has-small-font-size\">&#8211; Cierre de carril izquierdo, Diagonal Santander en el sentido San Mateo \u2013 Centro, Domingo 24 a partir de las 1:00 pm\u2013 6:00 pm.<\/p>\n\n\n\n<p class=\"has-small-font-size\">&#8211; Cierre de carril izquierdo, Diagonal Santander en el sentido Centro &#8211; San Mateo, lunes festivo 25 de marzo a partir de las 07:00 am\u2013 1:00 pm.<\/p>\n\n\n\n<p class=\"has-small-font-size\">&#8211; Cierre de carril derecho, Diagonal Santander en el sentido Centro &#8211; San Mateo, lunes festivo 25 de marzo a partir de las 1:00 pm\u2013 6:00 pm.<\/p>\n\n\n\n<h2 class=\"has-medium-font-size\" style=\"font-style:normal;font-weight:500\">CIERRE DE VIAS AV. 0 &#8211; CANAL BOG. 23\/3\/2024<\/h2>\n\n\n\n<p class=\"has-small-font-size\">El d\u00eda s\u00e1bado 23 en el horario de 5:00 am \u2013 2:00 pm, se proyecta cierre en la Av.0 en intersecci\u00f3n con Canal Bogot\u00e1 y Margen derecho Canal Bogot\u00e1 con Av. 1 Barrio Lleras en sentido Sur \u2013 Norte, intervenci\u00f3n que se efect\u00faa con el objeto de realizar recuperaci\u00f3n de las \u00e1reas intervenidas con las obras de acueducto y alcantarillado sanitario.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Al finalizar las actividades se habilita la v\u00eda al tr\u00e1nsito vehicular, se agradece a la comunidad en general tomar rutas alternas antes de los respectivos cierres, atendiendo a las se\u00f1ales dispuestas en la V\u00eda.<\/p>\n\n\n\n<h2 class=\"has-medium-font-size\" style=\"font-style:normal;font-weight:500\">CIERRE DE VIAS AV. 0 &#8211; CANAL BOG &#8211; BARRIO LLERAS 16\/3\/2024 Y 17\/3\/2024<\/h2>\n\n\n\n<p class=\"has-small-font-size\">Informamos que el d\u00eda s\u00e1bado 16 y domingo 17 de marzo en el horario de 7:00 am a 5:00 pm, se proyecta cierre en la Av. 0 en intersecci\u00f3n con Canal Bogot\u00e1 y Margen derecho Canal Bogot\u00e1 con Av. 1 Barrio Lleras en sentido Sur \u2013 Norte, intervenci\u00f3n que se efect\u00faa con el objeto de finalizar instalaci\u00f3n de alcantarillado sanitario de 39\u201d en PVC.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Al finalizar las actividades se habilitar\u00e1 la v\u00eda al tr\u00e1nsito vehicular. Se agradece a la comunidad en general, tomar rutas alternas antes de los respectivos cierres, atendiendo a las se\u00f1ales dispuestas en la V\u00eda.<\/p>\n\n\n\n<h2 class=\"has-medium-font-size\" style=\"font-style:normal;font-weight:500;text-transform:uppercase\">CIERRE DE VIAS DIAG. SANTANDER &#8211; BARRIO LLERAS  &#8211; CC VENTURA PLAZA 11\/3\/2024<\/h2>\n\n\n\n<p class=\"has-small-font-size\">\ud835\udc00\ud835\udc06\ud835\udc14\ud835\udc00\ud835\udc12 \ud835\udc0a\ud835\udc0f\ud835\udc08\ud835\udc13\ud835\udc00\ud835\udc0b \ud835\udc02\u00da\ud835\udc02\ud835\udc14\ud835\udc13\ud835\udc00 S.A. E.S.P., informa a la Ciudadan\u00eda en general que a partir del d\u00eda lunes 11 de marzo en el horario de 7:00 am a 7:00 pm, con una duraci\u00f3n de aproximadamente 4.5 semanas, se proyecta cierre en el margen derecho Canal Bogot\u00e1 entre Diagonal Santander y Av. 1 del Barrio Lleras, con el objeto de realizar proceso de instalaci\u00f3n de tuber\u00eda de alcantarillado sanitario \u00d836\u201d.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Al finalizar las actividades se habilitar\u00e1 la v\u00eda al tr\u00e1nsito vehicular, se agradece a la comunidad en general, tomar rutas alternas antes de los respectivos cierres, atendiendo a las se\u00f1ales dispuestas en la V\u00eda.<\/p>\n\n\n\n<h2 class=\"has-medium-font-size\" style=\"font-style:normal;font-weight:500\">CIERRE DE VIAS AV. 0 CON CANAL BGTA. &#8211; CLL 4A BARRIO PESCADERO 28\/2\/2024<\/h2>\n\n\n\n<p class=\"has-small-font-size\">Informamos a la Ciudadan\u00eda en general que el d\u00eda mi\u00e9rcoles 28 de febrero se proyecta cierre en la Av.0 con Canal Bogot\u00e1 en intersecci\u00f3n con Cl 4\u00aa del Barrio Pescadero en el sentido Norte \u2013 Sur, Margen derecho Canal Bogot\u00e1 con Av. 1 Barrio Lleras en sentido Sur \u2013 Norte y margen derecho del canal Bogot\u00e1 a la altura de la Calle 6 Norte con puente que comunica con la zona industrial, en el horario de 5:00 am hasta las 10:00 am, y en el Canal Bogot\u00e1 margen derecho, a la altura de la Calle 6 Norte y Puente que conecta a la zona industrial a partir de las 10:00 am a 10:00 pm.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Los cierres se ejecutan con el objeto de finalizar instalaci\u00f3n tuber\u00eda de acueducto \u00d816\u201d en Av.0 y realizar empalmes hidr\u00e1ulicos.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Al finalizar las actividades se habilita la v\u00eda al tr\u00e1nsito vehicular, se agradece a la comunidad en general tomar rutas alternas antes de los respectivos cierres, atendiendo a las se\u00f1ales dispuestas en la V\u00eda.<\/p>\n\n\n\n<h2 class=\"has-medium-font-size\" style=\"font-style:normal;font-weight:500\">CIERRE DE VIAS CANAL BGTA. &#8211; PUENTE JOROBADO 9\/3\/2024<\/h2>\n\n\n\n<p class=\"has-small-font-size\">Informamos que el d\u00eda s\u00e1bado 09 de marzo en el horario de 7 am a 7 pm, se proyecta cierre en el margen derecho Canal Bogot\u00e1 en intersecci\u00f3n con Av. 3 y puente jorobado Barrio Lleras, con el objeto de realizar proceso de instalaci\u00f3n de tuber\u00eda de alcantarillado sanitario 36\u201d.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Al finalizar las actividades se habilita la v\u00eda al tr\u00e1nsito vehicular, se agradece a la comunidad en general, tomar rutas alternas antes de los respectivos cierres, atendiendo a las se\u00f1ales dispuestas en la V\u00eda.<\/p>\n\n\n\n<h2 class=\"has-medium-font-size\" style=\"font-style:normal;font-weight:500;text-transform:uppercase\">CIERRE DE VIAS Entrada al Barrio Torcoroma  &#8211; CC VENTURA PLAZA 3\/12\/2023<\/h2>\n\n\n\n<p class=\"has-small-font-size\">Que el d\u00eda domingo 3 de diciembre, se efectuar\u00e1 cierre de la entrada al Barrio Torcoroma a la altura de la calle 7 con Av. 7 del barrio San Luis, a partir de las 07:00 am hasta las 5:00 pm, con el objeto de realizar reposici\u00f3n de la red de acueducto. Al finalizar la jornada, se habilitar\u00e1 la v\u00eda al tr\u00e1nsito vehicular.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Se agradece a la comunidad en general, tomar rutas alternas antes de los respectivos cierres, atendiendo a las se\u00f1ales dispuestas en la v\u00eda.<\/p>\n\n\n\n<h2 class=\"has-medium-font-size\" style=\"font-style:normal;font-weight:500\">CIERRE DE VIAS ENTRADA BARRIO EL BOSQUE &#8211; CC VENTURA PLAZA 13\/11\/2023<\/h2>\n\n\n\n<p class=\"has-small-font-size\">\ud835\udc00\ud835\udc06\ud835\udc14\ud835\udc00\ud835\udc12 \ud835\udc0a\ud835\udc0f\ud835\udc08\ud835\udc13\ud835\udc00\ud835\udc0b \ud835\udc02\u00da\ud835\udc02\ud835\udc14\ud835\udc13\ud835\udc00 S.A. E.S.P., informa a la Ciudadan\u00eda en general que el d\u00eda lunes festivo 13 de noviembre, se efectuar\u00e1 cierre de v\u00eda en la entrada al Barrio El Bosque en intersecci\u00f3n con margen derecho del canal Bogot\u00e1, con el objeto de realizar reposici\u00f3n de la red de Alcantarillado Sanitario. Al finalizar la jornada, se habilitar\u00e1 la v\u00eda al tr\u00e1nsito vehicular.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Se agradece a la comunidad en general, tomar rutas alternas antes de los respectivos cierres, atendiendo a las se\u00f1ales dispuestas en la V\u00eda.<\/p>\n\n\n\n<h2 class=\"has-medium-font-size\" style=\"font-style:normal;font-weight:500\">CIERRE DE VIAS DIAGONAL SANTANDER TERMINAL &#8211; CC VENTURA PLAZA 31\/08\/2023<\/h2>\n\n\n\n<p class=\"has-small-font-size\">\ud835\udc00\ud835\udc06\ud835\udc14\ud835\udc00\ud835\udc12 \ud835\udc0a\ud835\udc0f\ud835\udc08\ud835\udc13\ud835\udc00\ud835\udc0b \ud835\udc02\u00da\ud835\udc02\ud835\udc14\ud835\udc13\ud835\udc00 S.A. E.S.P., informa a la Ciudadan\u00eda en general, que en atenci\u00f3n al hundimiento generado por el colapso del colector de alcantarillado sanitario existente en material de concreto, que cruza la diagonal Santander a la altura del puente atirantado Eustorgio Colmenares, se proyecta intervenci\u00f3n para reposici\u00f3n del tramo afectado durante los d\u00edas S\u00e1bado 02 a lunes 04 de septiembre en la diagonal Santander sentido C.C. Ventura Plaza \u2013 Terminal y <a><\/a>los d\u00edas lunes 04 al s\u00e1bado 09 de septiembre, en la diagonal Santander sentido Terminal \u2013 C.C. Ventura Plaza.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Se agradece a la comunidad en general, tomar rutas alternas antes de los respectivos cierres, y atender la se\u00f1alizaci\u00f3n dispuesta en obra.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"819\" height=\"1024\" src=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/09\/373607232_694485582705559_7650271858143964469_n-819x1024.jpg\" alt=\"\" class=\"wp-image-2394\" srcset=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/09\/373607232_694485582705559_7650271858143964469_n-819x1024.jpg 819w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/09\/373607232_694485582705559_7650271858143964469_n-240x300.jpg 240w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/09\/373607232_694485582705559_7650271858143964469_n-768x960.jpg 768w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/09\/373607232_694485582705559_7650271858143964469_n-100x125.jpg 100w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/09\/373607232_694485582705559_7650271858143964469_n-1050x1313.jpg 1050w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/09\/373607232_694485582705559_7650271858143964469_n.jpg 1080w\" sizes=\"(max-width: 819px) 100vw, 819px\" \/><\/figure>\n\n\n\n<h2 class=\"has-medium-font-size\">CIERRE DE VIAS CLL 6 AV 6 BARRIO LA SEXTA 22\/08\/2023<\/h2>\n\n\n\n<p class=\"has-small-font-size\">Aguas Kpital C\u00facuta S.A ESP, informa que realizar\u00e1 la recuperaci\u00f3n de la carpeta Asf\u00e1ltica en la Calle 6 con Av. 6 del Barrio La Sexta, motivo por el cual se hace necesario realizar cierre vial parcial este mi\u00e9rcoles 23 y jueves 24 de agosto, desde las 7:00 de la ma\u00f1ana hasta las 4:00 de la tarde.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Durante esta jornada, se llevar\u00e1 a cabo el proceso de recuperaci\u00f3n, tapado y sellado de la superficie para permitir el libre tr\u00e1nsito vehicular en condiciones de seguridad, con toda <a><\/a>la log\u00edstica necesaria para la se\u00f1alizaci\u00f3n vial, personal de apoyo y los desv\u00edos necesarios para garantizar la adecuada movilidad.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Se recomienda tomar rutas alternas.<a href=\"https:\/\/www.facebook.com\/ad_center\/create\/boostpost\/?entry_point=www_profile_plus_timeline&amp;page_id=140117712749514&amp;target_id=689657359855048&amp;__cft__[0]=AZV__z_wHGnWNIAFOPfmxRi_794Zl8D4fcYbcLGPOt7r9w3_j5es7V64iJAcmTTBY5MEeZp6W7CHzIVBck6_F6RkZL1luoY7acQPN4Mm95njSX_uv1Vqv3llLT_l-GZueDcnjXTfXDU06VH5LlWcqbzMR9Uuunp5L87HhGDuNpemjh_BVg36yiP6m8X19j2O3Xw&amp;__tn__=*W-R\"><\/a><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"819\" height=\"1024\" src=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/08\/367744126_689657313188386_2096649135675550645_n-819x1024.jpg\" alt=\"\" class=\"wp-image-2347\" srcset=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/08\/367744126_689657313188386_2096649135675550645_n-819x1024.jpg 819w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/08\/367744126_689657313188386_2096649135675550645_n-240x300.jpg 240w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/08\/367744126_689657313188386_2096649135675550645_n-768x960.jpg 768w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/08\/367744126_689657313188386_2096649135675550645_n-100x125.jpg 100w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/08\/367744126_689657313188386_2096649135675550645_n-1050x1313.jpg 1050w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/08\/367744126_689657313188386_2096649135675550645_n.jpg 1080w\" sizes=\"(max-width: 819px) 100vw, 819px\" \/><\/figure>\n\n\n\n<h2 class=\"has-medium-font-size\">CIERRE DE VIA Calle 13 entre Av. 1 y Av. 0ECalle 13 entre Av. 1 y Av. 0E 07\/08\/2023<\/h2>\n\n\n\n<p class=\"has-small-font-size\">\ud835\udc00\ud835\udc06\ud835\udc14\ud835\udc00\ud835\udc12 \ud835\udc0a\ud835\udc0f\ud835\udc08\ud835\udc13\ud835\udc00\ud835\udc0b \ud835\udc02\ud835\udc14\ud835\udc02\ud835\udc14\ud835\udc13\ud835\udc00 S.A. E.S.P., informa a la Ciudadan\u00eda en general que durante el d\u00eda Martes 08 de agosto se efectuar\u00e1 cierre en el tramo de la Calle 13 entre Av. 1 y Av. 0E y Avenida 0E Calle 12\u00aa-Calle 13 barrio Los Caobos y La Playa donde se proyecta para realizar recuperaci\u00f3n de la v\u00eda, en material de asfalto, se agradece a la comunidad en general tomar rutas alternas antes de los respectivos cierres.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"819\" height=\"1024\" src=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/08\/365184841_681197480701036_8745577144154788169_n-2-819x1024.jpg\" alt=\"\" class=\"wp-image-2322\" srcset=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/08\/365184841_681197480701036_8745577144154788169_n-2-819x1024.jpg 819w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/08\/365184841_681197480701036_8745577144154788169_n-2-240x300.jpg 240w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/08\/365184841_681197480701036_8745577144154788169_n-2-768x960.jpg 768w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/08\/365184841_681197480701036_8745577144154788169_n-2-100x125.jpg 100w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/08\/365184841_681197480701036_8745577144154788169_n-2.jpg 1024w\" sizes=\"(max-width: 819px) 100vw, 819px\" \/><\/figure>\n\n\n\n<h2 class=\"has-medium-font-size\">CIERRE DE VIA Calle 13 entre Av. 0 &#8211; Av. 05\/08\/2023<\/h2>\n\n\n\n<p class=\"has-small-font-size\">Aguas Kpital C\u00facuta S.A. E.S.P. informa a la ciudadan\u00eda en general que durante el d\u00eda S\u00e1bado 05 de agosto, se efectuar\u00e1 cierre en el tramo de la Calle 13 entre Av. 0 &#8211; Av. 0E barrio Los Caobos, para ejecutar empalmes y conexiones hidr\u00e1ulicas en tuber\u00eda de \u00d816\u201dGRP. Se agradece a la comunidad en general tomar rutas alternas antes del respectivo cierre.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"819\" height=\"1024\" src=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/08\/364135213_680102284143889_1612290156410074518_n-1-819x1024.jpg\" alt=\"\" class=\"wp-image-2324\" srcset=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/08\/364135213_680102284143889_1612290156410074518_n-1-819x1024.jpg 819w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/08\/364135213_680102284143889_1612290156410074518_n-1-240x300.jpg 240w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/08\/364135213_680102284143889_1612290156410074518_n-1-768x960.jpg 768w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/08\/364135213_680102284143889_1612290156410074518_n-1-100x125.jpg 100w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/08\/364135213_680102284143889_1612290156410074518_n-1-1050x1313.jpg 1050w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/08\/364135213_680102284143889_1612290156410074518_n-1.jpg 1080w\" sizes=\"(max-width: 819px) 100vw, 819px\" \/><\/figure>\n\n\n\n<h2 class=\"has-medium-font-size\">CIERRE DE VIA CLL 13 AV 2 Y 3 15\/07\/2023<\/h2>\n\n\n\n<p class=\"has-small-font-size\">AGUAS KPITAL C\u00daCUTA S.A. E.S.P. informa a la ciudadan\u00eda en general que a partir del d\u00eda lunes 17 de julio hasta el d\u00eda domingo 13 de agosto, se efectuar\u00e1 cierre de la v\u00eda en la calle 13 entre Av. 2 y 3 del barrio La Playa, continuando con la reposici\u00f3n de redes de acueducto en tuber\u00eda GRP \u00d824\u201d y PVC \u00d84\u201d, se recomienda atender las se\u00f1ales de tr\u00e1nsito y tomar rutas alternas.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"819\" height=\"1024\" src=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/08\/360103210_667383288749122_9146850950109357703_n-819x1024.jpg\" alt=\"\" class=\"wp-image-2323\" srcset=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/08\/360103210_667383288749122_9146850950109357703_n-819x1024.jpg 819w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/08\/360103210_667383288749122_9146850950109357703_n-240x300.jpg 240w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/08\/360103210_667383288749122_9146850950109357703_n-768x960.jpg 768w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/08\/360103210_667383288749122_9146850950109357703_n-100x125.jpg 100w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/08\/360103210_667383288749122_9146850950109357703_n-1050x1313.jpg 1050w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/08\/360103210_667383288749122_9146850950109357703_n.jpg 1080w\" sizes=\"(max-width: 819px) 100vw, 819px\" \/><\/figure>\n\n\n\n<h2 class=\"has-medium-font-size\">CIERRE DE VIA CLL 13 AV3 &#8211; 14\/07\/2023<\/h2>\n\n\n\n<p class=\"has-small-font-size\">\ud835\udc00\ud835\udc06\ud835\udc14\ud835\udc00\ud835\udc12 \ud835\udc0a\ud835\udc0f\ud835\udc08\ud835\udc13\ud835\udc00\ud835\udc0b \ud835\udc02\u00da\ud835\udc02\ud835\udc14\ud835\udc13\ud835\udc00 S.A. E.S.P. informa a la ciudadan\u00eda en general que durante los d\u00edas s\u00e1bado 15 de julio y domingo 16 de julio, se efectuar\u00e1 cierre en dos puntos de la Calle 13 entre Av. 1 y Av. 0 Este, el segundo en la intersecci\u00f3n de la Calle 13 con la Avenida 3, cerrando las v\u00edas en su totalidad de la Calle 13 entre Av. 4 y Av. 2 y de Av. 3 entre Calle 12 y Calle 14 Barrio la playa.<\/p>\n\n\n\n<p class=\"has-small-font-size\">El primer cierre de la Calle 13 con Av. 0 se proyecta para realizar recuperaci\u00f3n de la v\u00eda, en material de asfalto, el segundo cierre se proyecta para ejecutar empalmes y conexiones hidr\u00e1ulicas en tuber\u00eda de \u00d824\u201d y \u00d84\u201d, se agradece a la comunidad en general tomar rutas alternas antes de los respectivos cierres.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"819\" height=\"1024\" src=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/07\/360087781_667817165372401_206355316638174502_n-819x1024.jpg\" alt=\"\" class=\"wp-image-2241\" srcset=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/07\/360087781_667817165372401_206355316638174502_n-819x1024.jpg 819w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/07\/360087781_667817165372401_206355316638174502_n-240x300.jpg 240w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/07\/360087781_667817165372401_206355316638174502_n-768x960.jpg 768w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/07\/360087781_667817165372401_206355316638174502_n-100x125.jpg 100w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/07\/360087781_667817165372401_206355316638174502_n-1050x1313.jpg 1050w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/07\/360087781_667817165372401_206355316638174502_n.jpg 1080w\" sizes=\"(max-width: 819px) 100vw, 819px\" \/><\/figure>\n\n\n\n<h2 class=\"has-medium-font-size\">CIERRE DE VIA AV. Guaimaral hasta la Cl 15N, Barrio Zulima &#8211; 13\/07\/2023<\/h2>\n\n\n\n<p class=\"has-small-font-size\">\ud835\udc00\ud835\udc06\ud835\udc14\ud835\udc00\ud835\udc12 \ud835\udc0a\ud835\udc0f\ud835\udc08\ud835\udc13\ud835\udc00\ud835\udc0b \ud835\udc02\u00da\ud835\udc02\ud835\udc14\ud835\udc13\ud835\udc00 S.A. E.S.P. informa a la ciudadan\u00eda en general, que a partir del 17 de julio al 09 de agosto, se efectuar\u00e1 cierre del margen derecho canal Bogot\u00e1 desde la AV. Guaimaral hasta la Cl 15N, Barrio Zulima, se proyecta realizar la reposici\u00f3n de redes de alcantarillado sanitario en una longitud de 147 m tuber\u00eda \u00d842\u201d y reposici\u00f3n de acueducto en una longitud de 147 m tuber\u00eda de \u00d812\u201d, se recomienda tomar rutas alternas y atender las se\u00f1ales de <a><\/a>desvi\u00f3.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Se mantiene la intervenci\u00f3n en el margen derecho del Canal Bogot\u00e1 desde la Av. Cero hasta la Cl 1N del barrio Lleras la cual dio inicio el 05 de julio e ira hasta el 26 de agosto, con el objeto de realizar la reposici\u00f3n de redes de alcantarillado sanitario en una longitud de 397 m tuber\u00eda \u00d839\u201d,<\/p>\n\n\n\n<p class=\"has-small-font-size\">La reposici\u00f3n de redes se ejecutar\u00e1 por fases en todo el margen derecho del canal Bogot\u00e1, desde la diagonal Santander hasta la avenida Guaimaral.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"819\" height=\"1024\" src=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/07\/360103210_667383288749122_9146850950109357703_n-819x1024.jpg\" alt=\"\" class=\"wp-image-2235\" srcset=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/07\/360103210_667383288749122_9146850950109357703_n-819x1024.jpg 819w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/07\/360103210_667383288749122_9146850950109357703_n-240x300.jpg 240w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/07\/360103210_667383288749122_9146850950109357703_n-768x960.jpg 768w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/07\/360103210_667383288749122_9146850950109357703_n-100x125.jpg 100w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/07\/360103210_667383288749122_9146850950109357703_n-1050x1313.jpg 1050w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/07\/360103210_667383288749122_9146850950109357703_n.jpg 1080w\" sizes=\"(max-width: 819px) 100vw, 819px\" \/><\/figure>\n\n\n\n<h2 class=\"has-medium-font-size\">CIERRE DE VIA CLL 13 EN AV 0 Y AV 1E BARRIO LA PLAYA &#8211; 30\/06\/2023<\/h2>\n\n\n\n<p class=\"has-small-font-size\">AGUAS KPITAL C\u00daCUTA S.A. E.S.P., informa a la comunidad en general sobre el cierre de v\u00eda en la calle 13 entre Av. 0 y Av. 1E barrio La Playa, durante los d\u00edas 2 y 3 de Julio, con el objeto de realizar pruebas hidrost\u00e1ticas y adecuaciones hidr\u00e1ulicas.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Agradecemos a la ciudadan\u00eda, tomar rutas alternas.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"1024\" src=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/07\/347586417_659426669544784_466724212197204369_n-1024x1024.jpg\" alt=\"\" class=\"wp-image-2221\" srcset=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/07\/347586417_659426669544784_466724212197204369_n-1024x1024.jpg 1024w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/07\/347586417_659426669544784_466724212197204369_n-300x300.jpg 300w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/07\/347586417_659426669544784_466724212197204369_n-150x150.jpg 150w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/07\/347586417_659426669544784_466724212197204369_n-768x768.jpg 768w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/07\/347586417_659426669544784_466724212197204369_n-100x100.jpg 100w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/07\/347586417_659426669544784_466724212197204369_n-1050x1050.jpg 1050w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/07\/347586417_659426669544784_466724212197204369_n.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2> <\/h2>\n\n\n\n<h2 class=\"has-medium-font-size\">CIERRE DE VIA: TRAMO 1: CALLE 13 AV 4 &#8211; 3 LA PLAYA <\/h2>\n\n\n\n<p class=\"has-small-font-size\">Continua La FASE II del gran proyecto de RENOVACI\u00d3N DE REDES DE DISTRIBUCI\u00d3N de la zona c\u00e9ntrica de la ciudad.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Con el objeto de optimizar las redes de distribuci\u00f3n existentes y minimizar las afectaciones del servicio de acueducto en la zona c\u00e9ntrica de la ciudad, Aguas Kpital C\u00facuta SA ESP culmin\u00f3 la Fase I de RENOVACI\u00d3N DE REDES DE DISTRIBUCI\u00d3N en el mes de Mayo con una inversi\u00f3n de 1000 millones de pesos en los tramos: Calle 12A desde Homecenter hasta Avenida <a><\/a>1E( tuber\u00eda 16&#8243;y 4&#8243;) y Calle 13 Avenida 15-Avenida 13 ( Tuber\u00eda 24&#8243; y 4&#8243;)<\/p>\n\n\n\n<p class=\"has-small-font-size\">Esta mega obra avanza a la FASE II que se ejecutar\u00e1 en tres tramos con la renovaci\u00f3n de redes ubicadas en la Calle 13 entre Avenidas 1 y 4 con una inversi\u00f3n de m\u00e1s de 800 millones de pesos que se inicia el pr\u00f3ximo Lunes 26 de Junio hasta el 29 de Septiembre.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Esta fase incluye las siguientes actividades:<\/p>\n\n\n\n<p class=\"has-small-font-size\">&#8211; Corte, demolici\u00f3n y reposici\u00f3n de pavimento.<\/p>\n\n\n\n<p class=\"has-small-font-size\">&#8211; Movimiento de tierras<\/p>\n\n\n\n<p class=\"has-small-font-size\">&#8211; Suministro e instalaci\u00f3n de 315 m de 24&#8243; GRP y 315 m de 4\u201d y reposici\u00f3n de acometidas acueducto en PE HD \u00d8 1\/2&#8243;.<\/p>\n\n\n\n<p class=\"has-small-font-size\">La reposici\u00f3n de la red se\u00f1alada forma parte del proyecto de optimizaci\u00f3n del sistema de acueducto, incluido en el Plan Maestro de Acueducto desarrollado por la empresa, con el objeto de reducir la p\u00e9rdida de agua en el sistema y aumentar la capacidad de transporte en las redes matrices de la ciudad, asegurando la prestaci\u00f3n del servicio eficiente ante el crecimiento de la ciudad.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Agradecemos a la ciudadan\u00eda la comprensi\u00f3n y los invitamos a seguir las redes sociales oficiales de nuestra empresa, para que puedan estar actualizados sobre toda la informaci\u00f3n alrededor de dicha obra<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"819\" height=\"1024\" src=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/06\/347411696_654649030022548_7200781823269112049_n-819x1024.jpg\" alt=\"\" class=\"wp-image-2039\" srcset=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/06\/347411696_654649030022548_7200781823269112049_n-819x1024.jpg 819w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/06\/347411696_654649030022548_7200781823269112049_n-240x300.jpg 240w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/06\/347411696_654649030022548_7200781823269112049_n-768x960.jpg 768w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/06\/347411696_654649030022548_7200781823269112049_n-100x125.jpg 100w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/06\/347411696_654649030022548_7200781823269112049_n-1050x1313.jpg 1050w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/06\/347411696_654649030022548_7200781823269112049_n.jpg 1080w\" sizes=\"(max-width: 819px) 100vw, 819px\" \/><\/figure>\n\n\n\n<h2 class=\"has-medium-font-size\">CIERRE DE VIA CALLE 13 ENTRE AV 1 Y 1E- INTERSECCION AV 0 <\/h2>\n\n\n\n<p class=\"has-small-font-size\">\ud835\udc00\ud835\udc06\ud835\udc14\ud835\udc00\ud835\udc12 \ud835\udc0a\ud835\udc0f\ud835\udc08\ud835\udc13\ud835\udc00\ud835\udc0b \ud835\udc02\u00da\ud835\udc02\ud835\udc14\ud835\udc13\ud835\udc00 S.A. E.S.P. informa a la ciudadan\u00eda en general, que se efectuar\u00e1 cierre de la Calle 13 entre Av. 1 y 1E de los barrios Quinta V\u00e9lez y La Playa, incluye intersecci\u00f3n con Av. 0. durante los 6 y 7 de mayo, con el objetivo de realizar obras de instalaci\u00f3n de tuber\u00eda de acueducto en intersecci\u00f3n vial, se recomienda tomar rutas alternas.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"1024\" src=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/05\/345138365_3455095898098629_132900542481720608_n-1024x1024.png\" alt=\"\" class=\"wp-image-1916\" srcset=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/05\/345138365_3455095898098629_132900542481720608_n-1024x1024.png 1024w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/05\/345138365_3455095898098629_132900542481720608_n-300x300.png 300w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/05\/345138365_3455095898098629_132900542481720608_n-150x150.png 150w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/05\/345138365_3455095898098629_132900542481720608_n-768x768.png 768w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/05\/345138365_3455095898098629_132900542481720608_n-100x100.png 100w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/05\/345138365_3455095898098629_132900542481720608_n-1050x1050.png 1050w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/05\/345138365_3455095898098629_132900542481720608_n.png 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"has-medium-font-size\">\ud835\udc00\ud835\udc06\ud835\udc14\ud835\udc00\ud835\udc12 \ud835\udc0a\ud835\udc0f\ud835\udc08\ud835\udc13\ud835\udc00\ud835\udc0b \ud835\udc02\u00da\ud835\udc02\ud835\udc14\ud835\udc13\ud835\udc00 \ud835\udc12.\ud835\udc00. \ud835\udc04.\ud835\udc12.\ud835\udc0f \ud835\udc08\ud835\udc0d\ud835\udc05\ud835\udc0e\ud835\udc11\ud835\udc0c\ud835\udc00 \ud835\udc00 \ud835\udc0b\ud835\udc00 \ud835\udc02\ud835\udc08\ud835\udc14\ud835\udc03\ud835\udc00\ud835\udc03\ud835\udc00\ud835\udc0d\u00cd\ud835\udc00 \ud835\udc04\ud835\udc0d \ud835\udc06\ud835\udc04\ud835\udc0d\ud835\udc04\ud835\udc11\ud835\udc00\ud835\udc0b:<\/h2>\n\n\n\n<p class=\"has-small-font-size\">Que se efectuar\u00e1 cierre de v\u00eda en la Avenida 7 en intersecci\u00f3n con Calle 6 del barrio El Callej\u00f3n, durante los d\u00edas 15 y 16 de abril. Esto con el fin de realizar instalaci\u00f3n de tuber\u00eda de Alcantarillado Sanitario.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Importante resaltar que la v\u00eda ser\u00e1 habilitada hasta el d\u00eda lunes 17 de abril; se recomienda tomar desv\u00edos.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"1024\" src=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/05\/340819499_1671364369942726_4052758399717378123_n-1024x1024.jpg\" alt=\"\" class=\"wp-image-1920\" srcset=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/05\/340819499_1671364369942726_4052758399717378123_n-1024x1024.jpg 1024w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/05\/340819499_1671364369942726_4052758399717378123_n-300x300.jpg 300w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/05\/340819499_1671364369942726_4052758399717378123_n-150x150.jpg 150w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/05\/340819499_1671364369942726_4052758399717378123_n-768x768.jpg 768w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/05\/340819499_1671364369942726_4052758399717378123_n-100x100.jpg 100w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/05\/340819499_1671364369942726_4052758399717378123_n-1050x1050.jpg 1050w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/05\/340819499_1671364369942726_4052758399717378123_n.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"has-medium-font-size\">\ud835\udc00\ud835\udc06\ud835\udc14\ud835\udc00\ud835\udc12 \ud835\udc0a\ud835\udc0f\ud835\udc08\ud835\udc13\ud835\udc00\ud835\udc0b \ud835\udc02\u00da\ud835\udc02\ud835\udc14\ud835\udc13\ud835\udc00 \ud835\udc12.\ud835\udc00. \ud835\udc04.\ud835\udc12.\ud835\udc0f \ud835\udc08\ud835\udc0d\ud835\udc05\ud835\udc0e\ud835\udc11\ud835\udc0c\ud835\udc00 \ud835\udc00 \ud835\udc0b\ud835\udc00 \ud835\udc02\ud835\udc08\ud835\udc14\ud835\udc03\ud835\udc00\ud835\udc03\ud835\udc00\ud835\udc0d\u00cd\ud835\udc00 \ud835\udc04\ud835\udc0d \ud835\udc06\ud835\udc04\ud835\udc0d\ud835\udc04\ud835\udc11\ud835\udc00\ud835\udc0b:<\/h2>\n\n\n\n<p class=\"has-small-font-size\">\ud835\udc00\ud835\udc06\ud835\udc14\ud835\udc00\ud835\udc12 \ud835\udc0a\ud835\udc0f\ud835\udc08\ud835\udc13\ud835\udc00\ud835\udc0b \ud835\udc02\u00da\ud835\udc02\ud835\udc14\ud835\udc13\ud835\udc00 \ud835\udc12.\ud835\udc00 \ud835\udc04\ud835\udc12\ud835\udc0f, informa a la Ciudadan\u00eda en general, que se efectuar\u00e1 cierre de Avenida Guaimaral entre Calle 11AN y Calle 14 en el sentido Sur \u2013 Norte, durante 4 d\u00edas a partir de este 11 de abril hasta el d\u00eda 14 de abril, con el objetivo de realizar obras de instalaci\u00f3n de tuber\u00eda en intersecci\u00f3n vial.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Se recomienda tomar rutas alternas.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"1024\" src=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/05\/341008547_1363713817693953_5964322897709357867_n-1024x1024.png\" alt=\"\" class=\"wp-image-1927\" srcset=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/05\/341008547_1363713817693953_5964322897709357867_n-1024x1024.png 1024w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/05\/341008547_1363713817693953_5964322897709357867_n-300x300.png 300w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/05\/341008547_1363713817693953_5964322897709357867_n-150x150.png 150w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/05\/341008547_1363713817693953_5964322897709357867_n-768x768.png 768w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/05\/341008547_1363713817693953_5964322897709357867_n-100x100.png 100w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/05\/341008547_1363713817693953_5964322897709357867_n-1050x1050.png 1050w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/05\/341008547_1363713817693953_5964322897709357867_n.png 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h3 class=\"has-medium-font-size\">CIERRE DE V\u00cdAS ESTE S\u00c1BADO 18 DE MARZO HASTA LUNES 20 DE MARZO<\/h3>\n\n\n\n<p class=\"has-small-font-size\">Que debido a trabajos de reposici\u00f3n de Alcantarillado, se har\u00e1 necesario el cierre total de v\u00edas en los siguientes sectores de la ciudad:<br>Cll 15N con Avenida Guaimaral y en la AV 4 entre calle 22 y 21A Barrio San Mateo, durante los d\u00edas 18, 19 y 20 Marzo del presente a\u00f1o.<br>Recomendamos tomar rutas alternas y atender las indicaciones de tr\u00e1nsito.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"1024\" src=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/03\/CIERRE-DE-VIAS-1-1-1024x1024.png\" alt=\"\" class=\"wp-image-1779\" srcset=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/03\/CIERRE-DE-VIAS-1-1-1024x1024.png 1024w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/03\/CIERRE-DE-VIAS-1-1-300x300.png 300w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/03\/CIERRE-DE-VIAS-1-1-150x150.png 150w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/03\/CIERRE-DE-VIAS-1-1-768x768.png 768w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/03\/CIERRE-DE-VIAS-1-1-100x100.png 100w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/03\/CIERRE-DE-VIAS-1-1-1050x1050.png 1050w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/03\/CIERRE-DE-VIAS-1-1.png 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"1024\" src=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/03\/CIERRE-DE-VIAS-2-1-1024x1024.png\" alt=\"\" class=\"wp-image-1780\" srcset=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/03\/CIERRE-DE-VIAS-2-1-1024x1024.png 1024w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/03\/CIERRE-DE-VIAS-2-1-300x300.png 300w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/03\/CIERRE-DE-VIAS-2-1-150x150.png 150w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/03\/CIERRE-DE-VIAS-2-1-768x768.png 768w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/03\/CIERRE-DE-VIAS-2-1-100x100.png 100w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/03\/CIERRE-DE-VIAS-2-1-1050x1050.png 1050w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/03\/CIERRE-DE-VIAS-2-1.png 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-medium-font-size\">\ud835\udddc\ud835\udde1\ud835\udddc\ud835\uddd6\ud835\udddc\ud835\uddd4\ud835\udde0\ud835\udde2\ud835\udde6 \ud835\uddda\ud835\udde5\ud835\uddd4\ud835\udde1\ud835\uddd7\ud835\uddd8\ud835\udde6 \ud835\udde2\ud835\uddd5\ud835\udde5\ud835\uddd4\ud835\udde6 \ud835\uddd8\ud835\udde1 \ud835\udddf\ud835\uddd4 \ud835\udde9\u00cd\ud835\uddd4 \ud835\uddd4\ud835\udddf \ud835\udde3\u00d3\ud835\udde5\ud835\udde7\ud835\udddc\ud835\uddd6\ud835\udde2 \ud835\uddec \ud835\uddd4\ud835\udde9\ud835\uddd8\ud835\udde1\ud835\udddc\ud835\uddd7\ud835\uddd4 \ud835\uddda\ud835\udde8\ud835\uddd4\ud835\udddc\ud835\udde0\ud835\uddd4\ud835\udde5\ud835\uddd4\ud835\udddf<\/p>\n\n\n\n<p class=\"has-small-font-size\">AGUAS KPITAL C\u00daCUTA S.A E.S.P., informa a la comunidad en general, que dar\u00e1 inicio este 22 de febrero a la ejecuci\u00f3n de las obras de reposici\u00f3n de Acueducto y alcantarillado en dos sectores de gran impacto para la ciudad: la V\u00eda al P\u00f3rtico y Avenida Guaimaral.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Iniciaremos con la instalaci\u00f3n de Alcantarillado sanitario de 18\u201d, 16\u201d, 20\u201d y 24\u201d en la Av. 1 v\u00eda <a><\/a>P\u00f3rtico, una obra tendr\u00e1 una duraci\u00f3n de 5 meses y se desarrollar\u00e1 en dos frentes de trabajo, entre el Colegio El Bosque y el puente Benito Hern\u00e1ndez, por lo que se har\u00e1 necesario hacer el cierre a un carril. Se recomienda atender las se\u00f1ales de tr\u00e1nsito e indicaciones de Pare y Siga.<\/p>\n\n\n\n<p class=\"has-small-font-size\">De igual manera, este 22 de febrero tambi\u00e9n se dar\u00e1 inicio a trabajos de reposici\u00f3n de alcantarillado sanitario de 8\u201d y 39\u201d, y 4\u201d de Acueducto en la Av. 11E Guaimaral entre Cl 11N y Canal Bogot\u00e1, obras que se ejecutar\u00e1n por tramos con una duraci\u00f3n estimada de 2 meses y medio. El cierre de la calzada ser\u00e1 en el sentido Sur \u2013 Norte. Importante tener en cuenta rutas alternas y atender se\u00f1ales de desv\u00edo.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Se recomienda tener paciencia frente a estas dos grandes obras que optimizar\u00e1n el servicio de Acueducto y Alcantarillado sanitario en estos sectores, continuaremos de manera constante informando sobre el avance de dichas obras.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"819\" height=\"1024\" src=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/02\/332719566_651676673429893_5521955935187069567_n-819x1024.png\" alt=\"\" class=\"wp-image-1739\" srcset=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/02\/332719566_651676673429893_5521955935187069567_n-819x1024.png 819w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/02\/332719566_651676673429893_5521955935187069567_n-240x300.png 240w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/02\/332719566_651676673429893_5521955935187069567_n-768x960.png 768w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/02\/332719566_651676673429893_5521955935187069567_n-100x125.png 100w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/02\/332719566_651676673429893_5521955935187069567_n-1050x1313.png 1050w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/02\/332719566_651676673429893_5521955935187069567_n.png 1080w\" sizes=\"(max-width: 819px) 100vw, 819px\" \/><\/figure>\n\n\n\n<p class=\"has-medium-font-size\">\ud835\udc02\ud835\udc08\ud835\udc04\ud835\udc11\ud835\udc11\ud835\udc04 \ud835\udc03\ud835\udc04 \ud835\udc0c\ud835\udc04\ud835\udc03\ud835\udc08\ud835\udc0e \ud835\udc02\ud835\udc00\ud835\udc11\ud835\udc11\ud835\udc08\ud835\udc0b \ud835\udc04\ud835\udc12\ud835\udc13\ud835\udc04 \ud835\udc0c\ud835\udc00\ud835\udc11\ud835\udc13\ud835\udc04\ud835\udc12 \ud835\udfd0\ud835\udfcf \ud835\udc03\ud835\udc04 \ud835\udc05\ud835\udc04\ud835\udc01\ud835\udc11\ud835\udc04\ud835\udc11\ud835\udc0e \ud835\udc04\ud835\udc0d \ud835\udc0b\ud835\udc00 \ud835\udc00\ud835\udc14\ud835\udc13\ud835\udc0e\ud835\udc0f\ud835\udc08\ud835\udc12\ud835\udc13\ud835\udc00 \ud835\udc00\ud835\udc13\ud835\udc00\ud835\udc0b\ud835\udc00\ud835\udc18\ud835\udc00 (\ud835\udc15\u00ed\ud835\udc1a \ud835\udc1a\ud835\udc25 \ud835\udc2d\ud835\udc1e\ud835\udc2b\ud835\udc26\ud835\udc22\ud835\udc27\ud835\udc1a\ud835\udc25)<\/p>\n\n\n\n<p class=\"has-small-font-size\">Aguas Kpital C\u00facuta SA ESP, informa que con el fin de realizar la recuperaci\u00f3n de la carpeta asf\u00e1ltica en la autopista Atalaya (v\u00eda al terminal) por la entrada al Barrio 6 de enero, se ver\u00e1 en la obligaci\u00f3n de hacer cierre de medio carril.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Los trabajos se llevar\u00e1n a cabo este martes 21 de febrero 2023, desde las 06:00 a. m. a 1:00 p. m, con labores de replanteo y aplicaci\u00f3n de la mezcla asf\u00e1ltica. Se habilitar\u00e1 la v\u00eda para su libre circulaci\u00f3n durante el transcurso del d\u00eda con el fin de mitigar al m\u00e1ximo la afectaci\u00f3n de la movilidad a la comunidad.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Ofrecemos disculpas por las incomodidades que se puedan presentar y recomendamos tomar las rutas alternas aqu\u00ed dispuestas.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"1024\" src=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/02\/332561459_1153144902064808_7653513920302266624_n-1024x1024.jpg\" alt=\"\" class=\"wp-image-1714\" srcset=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/02\/332561459_1153144902064808_7653513920302266624_n-1024x1024.jpg 1024w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/02\/332561459_1153144902064808_7653513920302266624_n-300x300.jpg 300w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/02\/332561459_1153144902064808_7653513920302266624_n-150x150.jpg 150w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/02\/332561459_1153144902064808_7653513920302266624_n-768x768.jpg 768w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/02\/332561459_1153144902064808_7653513920302266624_n-100x100.jpg 100w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/02\/332561459_1153144902064808_7653513920302266624_n-1050x1050.jpg 1050w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/02\/332561459_1153144902064808_7653513920302266624_n.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"has-medium-font-size\">CIERRE DE VIAS 1 Avenida 5 Diagonal Santander &#8211; calle 4.<\/h2>\n\n\n\n<p class=\"has-small-font-size\">Aguas Kpital C\u00facuta S.A ESP, informa sobre el incio de las obras en \u00e1reas de gran impacto para la ciudad, durante este 2023.<\/p>\n\n\n\n<p class=\"has-small-font-size\">En este sentido, se dar\u00e1 inicio este lunes 6 de febrero, con la instalaci\u00f3n de redes de acueducto y alcantarillado en el Tramo 1 Avenida 5 Diagonal Santander &#8211; calle 4.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Recomendanos estar atentos al cierre de estas v\u00edas y tener en cuenta rutas alternas.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"819\" height=\"1024\" src=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/02\/329031848_757782049103201_2157050956999405752_n-819x1024.jpg\" alt=\"\" class=\"wp-image-1696\" srcset=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/02\/329031848_757782049103201_2157050956999405752_n-819x1024.jpg 819w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/02\/329031848_757782049103201_2157050956999405752_n-240x300.jpg 240w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/02\/329031848_757782049103201_2157050956999405752_n-768x960.jpg 768w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/02\/329031848_757782049103201_2157050956999405752_n-100x125.jpg 100w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/02\/329031848_757782049103201_2157050956999405752_n-1050x1313.jpg 1050w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/02\/329031848_757782049103201_2157050956999405752_n.jpg 1080w\" sizes=\"(max-width: 819px) 100vw, 819px\" \/><\/figure>\n\n\n\n<h2 class=\"has-medium-font-size\">\ud835\udc02\ud835\udc08\ud835\udc04\ud835\udc11\ud835\udc11\ud835\udc04 \ud835\udc03\ud835\udc04 \ud835\udc15\ud835\udc08\ud835\udc00 \ud835\udc04\ud835\udc12\ud835\udc13\ud835\udc04 \ud835\udc05\ud835\udc08\ud835\udc0d \ud835\udc03\ud835\udc04 \ud835\udc12\ud835\udc04\ud835\udc0c\ud835\udc00\ud835\udc0d\ud835\udc00 \ud835\udc04\ud835\udc0d \ud835\udc0b\ud835\udc00 \ud835\udc00\ud835\udc15\ud835\udc04\ud835\udc0d\ud835\udc08\ud835\udc03\ud835\udc00 \ud835\udfce \ud835\udc02\ud835\udc00\ud835\udc0b\ud835\udc0b\ud835\udc04 \ud835\udfcf\ud835\udfd6 \ud835\udc01\ud835\udc00\ud835\udc11\ud835\udc11\ud835\udc08\ud835\udc0e \ud835\udc01\ud835\udc0b\ud835\udc00\ud835\udc0d\ud835\udc02\ud835\udc0e<\/h2>\n\n\n\n<p class=\"has-small-font-size\">Aguas Kpital C\u00facuta S.A E.S.P, informa a la comunidad en general que debido a trabajos de instalaci\u00f3n de 19 m de tuber\u00eda de acueducto 8\u201dPVC, que se realizar\u00e1 en la intersecci\u00f3n de la Avenida 0 Calle 18 Barrio Blanco, se ver\u00e1 obligada a realizar cierre total de estas v\u00edas desde las 7:00 am del d\u00eda 8 de enero, hasta las 5.00 pm del d\u00eda 9 de enero del <a><\/a>presente a\u00f1o.<\/p>\n\n\n\n<p class=\"has-small-font-size\">El plan de manejo vial a ejecutar es el siguiente:<\/p>\n\n\n\n<p class=\"has-small-font-size\">-Para los veh\u00edculos que circulan en el sentido sur-norte, cruzar\u00e1n hacia el oriente por la calle 19 hasta la avenida 1AE para llegar a la calle 18 y luego cruzar\u00e1n hacia el occidente hasta llegar a la avenida 0.<\/p>\n\n\n\n<p class=\"has-small-font-size\">-Para los veh\u00edculos que circulan en el sentido norte-sur cruzar\u00e1n hacia el occidente por la calle 16 hasta la avenida 2A y llegar\u00e1n a la calle 19, para luego cruzar hacia el oriente hasta llegar a la avenida 0.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Durante la jornada de trabajo se utilizar\u00e1n se\u00f1ales preventivas e informativas de acuerdo a lo estipulado por el Instituto Nacional de V\u00edas (INVIAS), para la se\u00f1alizaci\u00f3n del \u00e1rea afectada por la obra.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Ofrecemos disculpas por las incomodidades que se puedan presentar durante la ejecuci\u00f3n de estos trabajos. Continuamos haciendo grandes inversiones por el bienestar y desarrollo de la ciudad.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"1024\" src=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323162312_1363184264222171_8892285921326175354_n-1024x1024.jpg\" alt=\"\" class=\"wp-image-1643\" srcset=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323162312_1363184264222171_8892285921326175354_n-1024x1024.jpg 1024w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323162312_1363184264222171_8892285921326175354_n-300x300.jpg 300w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323162312_1363184264222171_8892285921326175354_n-150x150.jpg 150w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323162312_1363184264222171_8892285921326175354_n-768x768.jpg 768w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323162312_1363184264222171_8892285921326175354_n-100x100.jpg 100w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323162312_1363184264222171_8892285921326175354_n-1050x1050.jpg 1050w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323162312_1363184264222171_8892285921326175354_n.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"has-medium-font-size\">\ud835\uddd6\ud835\udddc\ud835\uddd8\ud835\udde5\ud835\udde5\ud835\uddd8 \ud835\udde9\ud835\udddc\ud835\uddd4\ud835\udddf \ud835\uddd8\ud835\udde6\ud835\udde7\ud835\uddd8 \ud835\udde9\ud835\udddc\ud835\uddd8\ud835\udde5\ud835\udde1\ud835\uddd8\ud835\udde6 \ud835\udff2 \ud835\uddd7\ud835\uddd8 \ud835\uddd8\ud835\udde1\ud835\uddd8\ud835\udde5\ud835\udde2, \ud835\uddd8\ud835\udde1 \ud835\udddf\ud835\uddd4 \ud835\uddd4\ud835\udde9\ud835\uddd8\ud835\udde1\ud835\udddc\ud835\uddd7\ud835\uddd4 \ud835\udfed\ud835\udfec \ud835\uddd6\ud835\udde2\ud835\udde1 \ud835\uddd6\ud835\uddd4\ud835\udddf\ud835\udddf\ud835\uddd8 \ud835\udff4 \ud835\uddd5\ud835\uddd4\ud835\udde5\ud835\udde5\ud835\udddc\ud835\udde2 \ud835\uddd6\ud835\uddd8\ud835\udde1\ud835\udde7\ud835\udde5\ud835\udde2.<\/h2>\n\n\n\n<p class=\"has-small-font-size\">Aguas Kpital C\u00facuta S.A ESP, informa que con el fin de realizar la recuperaci\u00f3n de la carpeta asf\u00e1ltica en la avenida 10 con calle 8 del barrio Centro, se ver\u00e1 obligada a restringir el flujo vehicular en este sector, el d\u00eda viernes 06 de enero del 2023 desde las 07:00 am hasta las 03:00 pm.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Importante tener en cuenta el siguiente plan <a><\/a>de manejo vial:<\/p>\n\n\n\n<p class=\"has-small-font-size\">-Para los veh\u00edculos que vienen por la Av. 10, se realizar\u00e1 cierre desde la calle. 6 para que se desv\u00eden por el canal Bogot\u00e1 hasta la calle. 9 para buscar el parque Mercedes.<\/p>\n\n\n\n<p class=\"has-small-font-size\">-Los veh\u00edculos que vienen desde loma de Bol\u00edvar por la calle 7, seguir\u00e1n el flujo por esta misma v\u00eda hasta la av. 8.<\/p>\n\n\n\n<p class=\"has-small-font-size\">-Los veh\u00edculos que vienen por la calle. 8, se desviar\u00e1n por Av. 9 hasta la av. 6 para buscar el canal Bogot\u00e1.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Para la ejecuci\u00f3n de estas labores, se contar\u00e1 con paleteros y elementos de se\u00f1alizaci\u00f3n para cumplir con el manejo vial.<\/p>\n\n\n\n<p class=\"has-small-font-size\">De antemano ofrecemos disculpas por las incomodidades que se puedan presentar.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"1024\" src=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323635479_586069196678018_69036002704004518_n-1-1-1024x1024.jpg\" alt=\"\" class=\"wp-image-1641\" srcset=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323635479_586069196678018_69036002704004518_n-1-1-1024x1024.jpg 1024w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323635479_586069196678018_69036002704004518_n-1-1-300x300.jpg 300w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323635479_586069196678018_69036002704004518_n-1-1-150x150.jpg 150w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323635479_586069196678018_69036002704004518_n-1-1-768x768.jpg 768w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323635479_586069196678018_69036002704004518_n-1-1-100x100.jpg 100w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323635479_586069196678018_69036002704004518_n-1-1-1050x1050.jpg 1050w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323635479_586069196678018_69036002704004518_n-1-1.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"has-medium-font-size\">\ud835\udc02\ud835\udc08\ud835\udc04\ud835\udc11\ud835\udc11\ud835\udc04 \ud835\udc03\ud835\udc04 \ud835\udc15\ud835\udc08\ud835\udc00 \ud835\udc04\ud835\udc12\ud835\udc13\ud835\udc04 \ud835\udc05\ud835\udc08\ud835\udc0d \ud835\udc03\ud835\udc04 \ud835\udc12\ud835\udc04\ud835\udc0c\ud835\udc00\ud835\udc0d\ud835\udc00 \ud835\udc04\ud835\udc0d \ud835\udc0b\ud835\udc00 \ud835\udc00\ud835\udc15\ud835\udc04\ud835\udc0d\ud835\udc08\ud835\udc03\ud835\udc00 \ud835\udfce \ud835\udc02\ud835\udc00\ud835\udc0b\ud835\udc0b\ud835\udc04 \ud835\udfcf\ud835\udfd6 \ud835\udc01\ud835\udc00\ud835\udc11\ud835\udc11\ud835\udc08\ud835\udc0e \ud835\udc01\ud835\udc0b\ud835\udc00\ud835\udc0d\ud835\udc02\ud835\udc0e<\/h2>\n\n\n\n<p class=\"has-small-font-size\">Aguas Kpital C\u00facuta S.A E.S.P, informa a la comunidad en general que debido a trabajos de instalaci\u00f3n de 19 m de tuber\u00eda de acueducto 8\u201dPVC, que se realizar\u00e1 en la intersecci\u00f3n de la Avenida 0 Calle 18 Barrio Blanco, se ver\u00e1 obligada a realizar cierre total de estas v\u00edas desde las 7:00 am del d\u00eda 8 de enero, hasta las 5.00 pm del d\u00eda 9 de enero del presente a\u00f1o.<\/p>\n\n\n\n<p class=\"has-small-font-size\">El plan de manejo vial a ejecutar es el siguiente:<\/p>\n\n\n\n<p class=\"has-small-font-size\">-Para los veh\u00edculos que circulan en el sentido sur-norte, cruzar\u00e1n hacia el oriente por la calle 19 hasta la avenida 1AE para llegar a la calle 18 y luego cruzar\u00e1n hacia el occidente hasta llegar a la avenida 0.<br>-Para los veh\u00edculos que circulan en el sentido<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"1024\" src=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323635479_586069196678018_69036002704004518_n-1-1024x1024.jpg\" alt=\"\" class=\"wp-image-1608\" srcset=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323635479_586069196678018_69036002704004518_n-1-1024x1024.jpg 1024w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323635479_586069196678018_69036002704004518_n-1-300x300.jpg 300w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323635479_586069196678018_69036002704004518_n-1-150x150.jpg 150w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323635479_586069196678018_69036002704004518_n-1-768x768.jpg 768w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323635479_586069196678018_69036002704004518_n-1-100x100.jpg 100w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323635479_586069196678018_69036002704004518_n-1-1050x1050.jpg 1050w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323635479_586069196678018_69036002704004518_n-1.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"has-small-font-size\">\ud835\uddd6\ud835\udddc\ud835\uddd8\ud835\udde5\ud835\udde5\ud835\uddd8 \ud835\udde9\ud835\udddc\ud835\uddd4\ud835\udddf \ud835\uddd8\ud835\udde6\ud835\udde7\ud835\uddd8 \ud835\udde9\ud835\udddc\ud835\uddd8\ud835\udde5\ud835\udde1\ud835\uddd8\ud835\udde6 \ud835\udff2 \ud835\uddd7\ud835\uddd8 \ud835\uddd8\ud835\udde1\ud835\uddd8\ud835\udde5\ud835\udde2, \ud835\uddd8\ud835\udde1 \ud835\udddf\ud835\uddd4 \ud835\uddd4\ud835\udde9\ud835\uddd8\ud835\udde1\ud835\udddc\ud835\uddd7\ud835\uddd4 \ud835\udfed\ud835\udfec \ud835\uddd6\ud835\udde2\ud835\udde1 \ud835\uddd6\ud835\uddd4\ud835\udddf\ud835\udddf\ud835\uddd8 \ud835\udff4 \ud835\uddd5\ud835\uddd4\ud835\udde5\ud835\udde5\ud835\udddc\ud835\udde2 \ud835\uddd6\ud835\uddd8\ud835\udde1\ud835\udde7\ud835\udde5\ud835\udde2.<\/h2>\n\n\n\n<p class=\"has-small-font-size\">Aguas Kpital C\u00facuta S.A ESP, informa que con el fin de realizar la recuperaci\u00f3n de la carpeta asf\u00e1ltica en la avenida 10 con calle 8 del barrio Centro, se ver\u00e1 obligada a restringir el flujo vehicular en este sector, el d\u00eda viernes 06 de enero del 2023 desde las 07:00 am hasta las 03:00 pm.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Importante tener en cuenta el siguiente plan de manejo vial:<\/p>\n\n\n\n<p class=\"has-small-font-size\">-Para los veh\u00edculos que vienen por la Av. 10, se realizar\u00e1 cierre desde la calle. 6 para que se desv\u00eden por el canal Bogot\u00e1 hasta la calle. 9 para buscar el parque Mercedes.<br>-Los veh\u00edculos que vienen desde loma de Bol\u00edvar por la calle 7, seguir\u00e1n el flujo por esta misma v\u00eda hasta la av. 8.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"1024\" src=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323635479_586069196678018_69036002704004518_n-1024x1024.jpg\" alt=\"\" class=\"wp-image-1603\" srcset=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323635479_586069196678018_69036002704004518_n-1024x1024.jpg 1024w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323635479_586069196678018_69036002704004518_n-300x300.jpg 300w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323635479_586069196678018_69036002704004518_n-150x150.jpg 150w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323635479_586069196678018_69036002704004518_n-768x768.jpg 768w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323635479_586069196678018_69036002704004518_n-100x100.jpg 100w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323635479_586069196678018_69036002704004518_n-1050x1050.jpg 1050w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/323635479_586069196678018_69036002704004518_n.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"has-medium-font-size\">cierre de v\u00eda en la Av. 1 entre Av. 21 A y 21 Barrio Rosal<\/h2>\n\n\n\n<p class=\"has-small-font-size\">\u00a1\ud835\udc00\ud835\udc13\ud835\udc04\ud835\udc0d\ud835\udc02\ud835\udc08\ud835\udc0e\u0301\ud835\udc0d!<img decoding=\"async\" loading=\"lazy\" height=\"16\" width=\"16\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/t9e\/1.5\/16\/1f6a8.png\" alt=\"\ud83d\udea8\"><\/p>\n\n\n\n<p class=\"has-small-font-size\">Que realizar\u00e1 cierre de v\u00eda en la Av. 1 entre Av. 21 A y 21 Barrio Rosal, a partir del d\u00eda viernes 16 de diciembre con una duraci\u00f3n estimada de 20 d\u00edas; esto con el fin de realizar reposici\u00f3n de la red de alcantarillado sanitario en tuber\u00eda de PVC 16\u201d.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Ofrecemos disculpas por las incomodidades que se puedan presentar durante la ejecuci\u00f3n de estos trabajos y recomendamos tomar rutas alternas.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Continuamos haciendo grandes inversiones por el bienestar y desarrollo de la ciudad.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"1024\" src=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/319325116_683914523197168_6854885671660968669_n-1024x1024.jpg\" alt=\"\" class=\"wp-image-1601\" srcset=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/319325116_683914523197168_6854885671660968669_n-1024x1024.jpg 1024w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/319325116_683914523197168_6854885671660968669_n-300x300.jpg 300w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/319325116_683914523197168_6854885671660968669_n-150x150.jpg 150w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/319325116_683914523197168_6854885671660968669_n-768x768.jpg 768w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/319325116_683914523197168_6854885671660968669_n-100x100.jpg 100w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/319325116_683914523197168_6854885671660968669_n-1050x1050.jpg 1050w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2023\/01\/319325116_683914523197168_6854885671660968669_n.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-small-font-size\"><img decoding=\"async\" loading=\"lazy\" height=\"16\" width=\"16\" alt=\"\ud83d\udea8\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/t9e\/1.5\/16\/1f6a8.png\">\u00a1\ud835\udc00\ud835\udc13\ud835\udc04\ud835\udc0d\ud835\udc02\ud835\udc08\ud835\udc0e\u0301\ud835\udc0d!<img decoding=\"async\" loading=\"lazy\" height=\"16\" width=\"16\" alt=\"\ud83d\udea8\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/t9e\/1.5\/16\/1f6a8.png\"><\/p>\n\n\n\n<p class=\"has-small-font-size\">\ud835\udc02\ud835\udc08\ud835\udc04\ud835\udc11\ud835\udc11\ud835\udc04 \ud835\udc03\ud835\udc04 \ud835\udc15\ud835\udc08\u0301\ud835\udc00 \ud835\udc04\ud835\udc0d \ud835\udc0b\ud835\udc00 \ud835\udc02\ud835\udc00\ud835\udc0b\ud835\udc0b\ud835\udc04 \ud835\udfd0\ud835\udc0d \ud835\udc04\ud835\udc0d\ud835\udc13\ud835\udc11\ud835\udc04 \ud835\udc00\ud835\udc15. \ud835\udfd0\ud835\udfce \ud835\udc18 \ud835\udfd0\ud835\udfcf \ud835\udc03\ud835\udc04\ud835\udc0b \ud835\udc01\ud835\udc00\ud835\udc11\ud835\udc11\ud835\udc08\ud835\udc0e \ud835\udc02\ud835\udc14\u0301\ud835\udc02\ud835\udc14\ud835\udc13\ud835\udc00 \ud835\udfd5\ud835\udfd3.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Aguas Kpital C\u00facuta S.A E.S.P. informa a la comunidad en general, del cierre de intersecci\u00f3n, Av. 21 con Cl. 2N del barrio C\u00facuta 75, continuando con cierre en la Cl 2N entre Av. 21 y 20 del barrio C\u00facuta 75, con objeto de realizar reposici\u00f3n de tuber\u00eda de alcantarillado de 8\u201d PVC, en una longitud de 142 metros, la intervenci\u00f3n dar\u00e1 <a><\/a>inicio el d\u00eda 24 al 28 de Octubre, en la intersecci\u00f3n, continuando en la Cl 2N entre Av. 21 y 20 el d\u00eda 31 de octubre de 2022, con una duraci\u00f3n estimada de mes y medio contado a partir de la fecha de inicio.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Con dichas obras se mejorar\u00e1 el servicio de recolecci\u00f3n y transporte de aguas residuales en esta zona de la ciudad.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Se recomienda tomar rutas alternas y ofrecemos disculpas por las incomodidades, que puedan presentarse durante la ejecuci\u00f3n de estos trabajos.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Continuamos haciendo grandes inversiones por el bienestar y desarrollo de la ciudad.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"1024\" src=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/10\/312610883_5484741624953736_4933670739092988691_n-1024x1024.jpg\" alt=\"\" class=\"wp-image-1509\" srcset=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/10\/312610883_5484741624953736_4933670739092988691_n-1024x1024.jpg 1024w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/10\/312610883_5484741624953736_4933670739092988691_n-300x300.jpg 300w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/10\/312610883_5484741624953736_4933670739092988691_n-150x150.jpg 150w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/10\/312610883_5484741624953736_4933670739092988691_n-768x768.jpg 768w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/10\/312610883_5484741624953736_4933670739092988691_n-100x100.jpg 100w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/10\/312610883_5484741624953736_4933670739092988691_n-1050x1050.jpg 1050w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/10\/312610883_5484741624953736_4933670739092988691_n.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-small-font-size\">\ud835\udc02\ud835\udc08\ud835\udc04\ud835\udc11\ud835\udc11\ud835\udc04 \ud835\udc03\ud835\udc04 V\u00cdA \ud835\udc00\ud835\udc15. \ud835\udc06\ud835\udc11\ud835\udc00\ud835\udc0d \ud835\udc02\ud835\udc0e\ud835\udc0b\ud835\udc0e\ud835\udc0c\ud835\udc01\ud835\udc08\ud835\udc00 CON \ud835\udc00\ud835\udc15. \ud835\udfd7\ud835\udc04<\/p>\n\n\n\n<p class=\"has-small-font-size\">Aguas Kpital C\u00facuta S.A E.S.P, informa a la comunidad en general que el d\u00eda lunes 3 de octubre del a\u00f1o en curso, se realizar\u00e1 el cierre de la v\u00eda Av. Gran Colombia con Av. 9 Este barrio Quinta Bosh, debido a da\u00f1o presentado en la red de acueducto, en el cual la empresa proceder\u00e1 a intervenir est\u00e1 \u00e1rea, con fin de realizar la reparaci\u00f3n correspondiente.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Los trabajos de intervenci\u00f3n y reparaci\u00f3n, se realizan de <a><\/a>manera oportuna como respuesta a la emergencia surgida, garantizando as\u00ed la prestaci\u00f3n del servicio y la mitigaci\u00f3n de la afectaci\u00f3n en la v\u00eda afectada, iniciando con el proceso de reparaci\u00f3n el d\u00eda de hoy 3 de octubre de 2022, seguido del tapado de la excavaci\u00f3n utilizando el equipo adecuado de compactaci\u00f3n una vez ejecutada la reparaci\u00f3n de la emergencia en la red de acueducto, proceso que se tiene proyectado culminar al medio d\u00eda del 04 de octubre del 2022 de no presentarse impases o contratiempos, periodo durante el cual nos vemos obligados a mantener el tr\u00e1nsito vehicular y peatonal restringido de manera parcial sobre el and\u00e9n, ciclo ruta y un carril de la calzada en el sentido Oriente &#8211; Occidente para garantizar la efectividad de los trabajos y la seguridad de los transe\u00fantes.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Ofrecemos disculpas por las incomodidades que se puedan presentar durante la ejecuci\u00f3n de estos trabajos.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"1024\" src=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/10\/310544741_5428274983933734_758627893181708849_n-1024x1024.jpg\" alt=\"\" class=\"wp-image-1458\" srcset=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/10\/310544741_5428274983933734_758627893181708849_n-1024x1024.jpg 1024w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/10\/310544741_5428274983933734_758627893181708849_n-300x300.jpg 300w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/10\/310544741_5428274983933734_758627893181708849_n-150x150.jpg 150w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/10\/310544741_5428274983933734_758627893181708849_n-768x768.jpg 768w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/10\/310544741_5428274983933734_758627893181708849_n-100x100.jpg 100w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/10\/310544741_5428274983933734_758627893181708849_n-1050x1050.jpg 1050w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/10\/310544741_5428274983933734_758627893181708849_n.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-small-font-size\"><img decoding=\"async\" loading=\"lazy\" height=\"16\" width=\"16\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/t9e\/1.5\/16\/1f6a8.png\" alt=\"\ud83d\udea8\">\u00a1\u00a1\ud835\udc00\ud835\udc13\ud835\udc04\ud835\udc0d\ud835\udc02\ud835\udc08\ud835\udc0e\u0301\ud835\udc0d!!<img decoding=\"async\" loading=\"lazy\" height=\"16\" width=\"16\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/t9e\/1.5\/16\/1f6a8.png\" alt=\"\ud83d\udea8\"><\/p>\n\n\n\n<p class=\"has-small-font-size\">Aguas Kpital C\u00facuta S.A E.S.P. informa a la comunidad en general, de los trabajos que se realizar\u00e1n en la autopista Atalaya, espec\u00edficamente en la entrada al barrio 6 de enero, hasta la AV 11 de Cerro la Cruz, cruzando la autopista.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Las obras a ejecutar corresponden a la instalaci\u00f3n de tuber\u00eda sin Zanja, aplicando un equipo de perforaci\u00f3n dirigido.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Se inician actividades el d\u00eda de hoy jueves 22 de septiembre, con una duraci\u00f3n estimada de 15 d\u00edas, la obra se ejecuta con el <a><\/a>objeto de realizar empalme de redes de acueducto, que mejora la prestaci\u00f3n del servicio para el barrio Cerro La Cruz.<\/p>\n\n\n\n<p class=\"has-small-font-size\">La obra no afectara el flujo vehicular en la Autopista Atalaya, se se\u00f1alizar\u00e1 un \u00e1rea reducida en los dos extremos del cruce a realizar, manteniendo los accesos a los dos barrios disponibles, sin embargo, se recomienda transitar a baja velocidad, ofrecemos disculpas por las incomodidades, que se puedan presentar durante la ejecuci\u00f3n de estos trabajos.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Continuamos haciendo grandes inversiones por el bienestar y desarrollo de la ciudad.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"1024\" src=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/09\/308129009_5394657213962178_720493127790115356_n-1024x1024.jpg\" alt=\"\" class=\"wp-image-1428\" srcset=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/09\/308129009_5394657213962178_720493127790115356_n-1024x1024.jpg 1024w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/09\/308129009_5394657213962178_720493127790115356_n-300x300.jpg 300w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/09\/308129009_5394657213962178_720493127790115356_n-150x150.jpg 150w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/09\/308129009_5394657213962178_720493127790115356_n-768x768.jpg 768w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/09\/308129009_5394657213962178_720493127790115356_n-100x100.jpg 100w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/09\/308129009_5394657213962178_720493127790115356_n-1050x1050.jpg 1050w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/09\/308129009_5394657213962178_720493127790115356_n.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"has-small-font-size\"><img decoding=\"async\" loading=\"lazy\" height=\"16\" width=\"16\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/t9e\/1.5\/16\/1f6a8.png\" alt=\"\ud83d\udea8\">\u00a1\u00a1\ud835\udc00\ud835\udc13\ud835\udc04\ud835\udc0d\ud835\udc02\ud835\udc08\ud835\udc0e\u0301\ud835\udc0d!!<img decoding=\"async\" loading=\"lazy\" height=\"16\" width=\"16\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/t9e\/1.5\/16\/1f6a8.png\" alt=\"\ud83d\udea8\"><\/h2>\n\n\n\n<h2 class=\"has-small-font-size\">\ud835\udc02\ud835\udc08\ud835\udc04\ud835\udc11\ud835\udc11\ud835\udc04 \ud835\udc13\ud835\udc0e\ud835\udc13\ud835\udc00\ud835\udc0b \ud835\udc03\ud835\udc04 \ud835\udc0b\ud835\udc00 \ud835\udc00\ud835\udc15. \ud835\udc06\ud835\udc11\ud835\udc00\ud835\udc0d \ud835\udc02\ud835\udc0e\ud835\udc0b\ud835\udc0e\ud835\udc0c\ud835\udc01\ud835\udc08\ud835\udc00 \ud835\udc04\ud835\udc0d\ud835\udc13\ud835\udc11\ud835\udc04 \ud835\udc0b\ud835\udc00\ud835\udc12 \ud835\udc00\ud835\udc15. \ud835\udfd7\ud835\udc04 \ud835\udc32 \ud835\udfcf\ud835\udfce\ud835\udc04<\/h2>\n\n\n\n<p class=\"has-small-font-size\">Aguas Kpital C\u00facuta S.A E.S.P, informa a la comunidad en general que el d\u00eda jueves 8 de septiembre del a\u00f1o en curso, a partir de las 7:00 a.m. habr\u00e1 cierre total del carril derecho en el sentido Occidente \u2013 Oriente el cual conduce del centro de la ciudad hacia la Avenida Libertadores entre la Avenida 9E y la Avenida 10E.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Los trabajos se realizar\u00e1n en la Avenida Gran Colombia <a><\/a>entre las Avenidas 9E y Avenida 10E del barrio Colsag, sobre el carril que conduce hacia la Avenida Libertadores, lo anterior con el prop\u00f3sito de rehabilitar la infraestructura afectada durante la atenci\u00f3n de la emergencia que se present\u00f3 en la red de acueducto el d\u00eda 31 de agosto del presente a\u00f1o, la cual requiere nuestra inmediata atenci\u00f3n para garantizar la integridad de la v\u00eda y la movilidad de la comunidad cucute\u00f1a.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Se estima iniciar el proceso de replanteo y adecuaci\u00f3n el jueves 08 de agosto, dejando la estructura lista para recibir la carpeta asf\u00e1ltica el viernes 09 de agosto. Como actividad paralela se ejecutar\u00e1n las vigas de confinamiento e instalaci\u00f3n de los ladrillos (adoquines) conformantes del delimitador cebra peatonal, lo que obliga a mantener la v\u00eda cerrada en el carril intervenido hasta el lunes 11 de septiembre, permitiendo el proceso de fraguado de las mencionadas vigas de confinamiento.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Para el desarrollo de la actividades se mantendr\u00e1 cerrada la totalidad de la Avenida Gran Colombia entre las Avenidas 9E y 10E en el sentido Occidente Oriente (carril que conduce de la Diagonal Santander a la Avenida Guaimaral), el tr\u00e1nsito regular que conduce por esta v\u00eda ser\u00e1 desviado por la Avenida 9E hasta las calles 6 y 7 por las cuales podr\u00e1n acceder a la Avenida 10E y a la Avenida Guaimaral, desde estas retomar la Avenida Gran Colombia y desde ah\u00ed su recorrido habitual<\/p>\n\n\n\n<p class=\"has-small-font-size\">Ofrecemos disculpas por las incomodidades que se puedan presentar durante la ejecuci\u00f3n de estos trabajos. Continuamos haciendo grandes inversiones por el bienestar y desarrollo de la ciudad.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"1024\" src=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/09\/304845636_5353793961381837_3642092701030010316_n-1024x1024.jpg\" alt=\"\" class=\"wp-image-1399\" srcset=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/09\/304845636_5353793961381837_3642092701030010316_n-1024x1024.jpg 1024w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/09\/304845636_5353793961381837_3642092701030010316_n-300x300.jpg 300w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/09\/304845636_5353793961381837_3642092701030010316_n-150x150.jpg 150w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/09\/304845636_5353793961381837_3642092701030010316_n-768x768.jpg 768w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/09\/304845636_5353793961381837_3642092701030010316_n-100x100.jpg 100w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/09\/304845636_5353793961381837_3642092701030010316_n-1050x1050.jpg 1050w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/09\/304845636_5353793961381837_3642092701030010316_n.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"has-small-font-size\"><img decoding=\"async\" loading=\"lazy\" height=\"16\" width=\"16\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/t9e\/1.5\/16\/1f6a8.png\" alt=\"\ud83d\udea8\">\u00a1\u00a1\ud835\udc00\ud835\udc13\ud835\udc04\ud835\udc0d\ud835\udc02\ud835\udc08\ud835\udc0e\u0301\ud835\udc0d!!<img decoding=\"async\" loading=\"lazy\" height=\"16\" width=\"16\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/t9e\/1.5\/16\/1f6a8.png\" alt=\"\ud83d\udea8\"><\/h2>\n\n\n\n<h2 class=\"has-small-font-size\">\ud835\udc02\ud835\udc08\ud835\udc04\ud835\udc11\ud835\udc11\ud835\udc04 \ud835\udc03\ud835\udc04 \ud835\udc15\ud835\udc08\u0301\ud835\udc00 \ud835\udc00\ud835\udc15. \ud835\udfcf \ud835\udc04\ud835\udc0d\ud835\udc13\ud835\udc11\ud835\udc04 \ud835\udc00\ud835\udc15. \ud835\udfd0\ud835\udfcf\ud835\udc01 \ud835\udc18 \ud835\udfd0\ud835\udfd1 \ud835\udc03\ud835\udc04\ud835\udc0b \ud835\udc01\ud835\udc00\ud835\udc11\ud835\udc11\ud835\udc08\ud835\udc0e \ud835\udc04\ud835\udc0b \ud835\udc11\ud835\udc0e\ud835\udc12\ud835\udc00\ud835\udc0b<\/h2>\n\n\n\n<p class=\"has-small-font-size\">Aguas Kpital C\u00facuta S.A E.S.P., informa a la comunidad en genera sobre el cierre de v\u00eda en la Av. 1 entre Av. 21B y 23 del barrio el Rosal, sentido Sur- Norte, para realizar reposici\u00f3n como emergencia de tuber\u00eda de alcantarillado de 16\u201d PVC, en una longitud de 92 metros, la intervenci\u00f3n dar\u00e1 inicio el d\u00eda lunes 08 de agosto de 2022, con una duraci\u00f3n estimada de 1 mes, contado a partir de la fecha de inicio. Con dichas obras se mejorar\u00e1 el servicio de recolecci\u00f3n y transporte de aguas residuales en la zona.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Se recomienda tomar rutas alternas, y ofrecemos disculpas por las incomodidades que puedan presentar durante la ejecuci\u00f3n de estos trabajos.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Continuamos haciendo grandes inversiones por el bienestar y desarrollo de la ciudad.<\/p>\n\n\n\n<figure class=\"is-layout-flex wp-block-gallery-1 wp-block-gallery has-nested-images columns-default is-cropped\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"1024\" data-id=\"1287\"  src=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/08\/298177678_5269758526452048_5070716169010001433_n-1024x1024.jpg\" alt=\"\" class=\"wp-image-1287\" srcset=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/08\/298177678_5269758526452048_5070716169010001433_n-1024x1024.jpg 1024w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/08\/298177678_5269758526452048_5070716169010001433_n-300x300.jpg 300w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/08\/298177678_5269758526452048_5070716169010001433_n-150x150.jpg 150w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/08\/298177678_5269758526452048_5070716169010001433_n-768x768.jpg 768w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/08\/298177678_5269758526452048_5070716169010001433_n-100x100.jpg 100w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/08\/298177678_5269758526452048_5070716169010001433_n-1050x1050.jpg 1050w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/08\/298177678_5269758526452048_5070716169010001433_n.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n\n\n<p class=\"has-small-font-size\"><img decoding=\"async\" loading=\"lazy\" height=\"16\" width=\"16\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/t9e\/1.5\/16\/1f6a8.png\" alt=\"\ud83d\udea8\">\u00a1\u00a1\ud835\udc00\ud835\udc13\ud835\udc04\ud835\udc0d\ud835\udc02\ud835\udc08\ud835\udc0e\u0301\ud835\udc0d!!<img decoding=\"async\" loading=\"lazy\" height=\"16\" width=\"16\" src=\"https:\/\/static.xx.fbcdn.net\/images\/emoji.php\/v9\/t9e\/1.5\/16\/1f6a8.png\" alt=\"\ud83d\udea8\"><\/p>\n\n\n\n<p class=\"has-small-font-size\">\ud835\udc02\ud835\udc08\ud835\udc04\ud835\udc11\ud835\udc11\ud835\udc04 \ud835\udc13\ud835\udc0e\ud835\udc13\ud835\udc00\ud835\udc0b \ud835\udc04\ud835\udc0d \ud835\udc0b\ud835\udc00 \ud835\udc00\ud835\udc15. \ud835\udc0b\ud835\udc08\ud835\udc01\ud835\udc04\ud835\udc11\ud835\udc13\ud835\udc00\ud835\udc03\ud835\udc0e\ud835\udc11\ud835\udc04\ud835\udc12 \ud835\udc04\ud835\udc0d\ud835\udc13\ud835\udc11\ud835\udc04 \ud835\udc02\ud835\udc00\ud835\udc0b\ud835\udc0b\ud835\udc04\ud835\udc12 \ud835\udfd2 \ud835\udc18 \ud835\udfd3.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Aguas Kpital C\u00facuta informa a la comunidad en general, que el d\u00eda jueves 21 de julio del 2022 desde las 8:00 a.m. se realizar\u00e1 el CIERRE TOTAL en la avenida Libertadores entre calles 4 y 5 del barrio Colsag en el sentido sur-norte, v\u00eda que comunica el sector del Malec\u00f3n con el puente Arnulfo Brice\u00f1o \u201cpuente de guadua\u201d punto de referencia, frente al restaurante MITO HOUSE y CARNES TORO BRAVO.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Dicho cierre se realizar\u00e1 con el fin de desarrollar trabajos de reparaci\u00f3n de tuber\u00eda de alcantarillado de \u00d8 20\u201d material PVC, posterior tapado de la excavaci\u00f3n y recuperaci\u00f3n de la v\u00eda asfalto; adem\u00e1s, esta obra garantizar\u00e1 un servicio \u00f3ptimo de alcantarillado sanitario a los habitantes del \u00e1rea metropolitana de C\u00facuta, debido a que esta tuber\u00eda es un colector principal.<\/p>\n\n\n\n<p class=\"has-small-font-size\">La intervenci\u00f3n tiene una duraci\u00f3n aproximada de (120) horas para la reparaci\u00f3n y el tapado de la excavaci\u00f3n y 15 d\u00edas h\u00e1biles para la recuperaci\u00f3n de la carpeta de rodadura Asfalto.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Recomendamos a la ciudadan\u00eda en general tomar la siguiente v\u00eda alterna para evitar trastorno vehicular:<\/p>\n\n\n\n<p class=\"has-small-font-size\">Se sugiere el desv\u00edo de los veh\u00edculos por el retorno de la avenida 8a, subir una cuadra hasta la calle 9, bajar por la avenida Guaimaral y desembocar los veh\u00edculos en la avenida gran Colombia donde podr\u00e1n continuar por la avenida Guaimaral o en su defecto tomar el puente de guadua; para esta labor la empresa dispondr\u00e1 de personal con se\u00f1ales de tr\u00e1nsito y la respectiva se\u00f1alizaci\u00f3n vial exigida.<\/p>\n\n\n\n<p class=\"has-small-font-size\">Agradecemos su comprensi\u00f3n y ofrecemos disculpas ante las incomodidades que puedan presentarse.<\/p>\n\n\n\n<figure class=\"is-layout-flex wp-block-gallery-3 wp-block-gallery has-nested-images columns-default is-cropped\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"1024\" data-id=\"1213\"  src=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/07\/294487070_5217948361633065_5973413727520039070_n-1024x1024.jpg\" alt=\"\" class=\"wp-image-1213\" srcset=\"https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/07\/294487070_5217948361633065_5973413727520039070_n-1024x1024.jpg 1024w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/07\/294487070_5217948361633065_5973413727520039070_n-300x300.jpg 300w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/07\/294487070_5217948361633065_5973413727520039070_n-150x150.jpg 150w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/07\/294487070_5217948361633065_5973413727520039070_n-768x768.jpg 768w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/07\/294487070_5217948361633065_5973413727520039070_n-100x100.jpg 100w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/07\/294487070_5217948361633065_5973413727520039070_n-1050x1050.jpg 1050w, https:\/\/akc.com.co\/web\/wp-content\/uploads\/2022\/07\/294487070_5217948361633065_5973413727520039070_n.jpg 1080w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>\ud835\udc02\ud835\udc08\ud835\udc04\ud835\udc11\ud835\udc11\ud835\udc04 \ud835\udc03\ud835\udc04 \ud835\udc15\ud835\udc08\u0301\ud835\udc00 \ud835\udc04\ud835\udc0d \ud835\udc0b\ud835\udc00 \ud835\udc00\ud835\udc15\ud835\udc04\ud835\udc0d\ud835\udc08\ud835\udc03\ud835\udc00 2 Y 3 CON CALLE 8 BARRIO LATINO 07\/09\/2025 Aguas Kpital C\u00facuta S.A.E.S.P., Informa a la comunidad en general del cierre vial que se &#8230; <\/p>\n<div><a href=\"https:\/\/akc.com.co\/web\/2025\/01\/24\/cierre-de-vias\/\" class=\"more-link\">Read More<\/a><\/div>\n","protected":false},"author":4,"featured_media":1676,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0},"categories":[18],"tags":[],"_links":{"self":[{"href":"https:\/\/akc.com.co\/web\/wp-json\/wp\/v2\/posts\/1201"}],"collection":[{"href":"https:\/\/akc.com.co\/web\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/akc.com.co\/web\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/akc.com.co\/web\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/akc.com.co\/web\/wp-json\/wp\/v2\/comments?post=1201"}],"version-history":[{"count":62,"href":"https:\/\/akc.com.co\/web\/wp-json\/wp\/v2\/posts\/1201\/revisions"}],"predecessor-version":[{"id":3300,"href":"https:\/\/akc.com.co\/web\/wp-json\/wp\/v2\/posts\/1201\/revisions\/3300"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/akc.com.co\/web\/wp-json\/wp\/v2\/media\/1676"}],"wp:attachment":[{"href":"https:\/\/akc.com.co\/web\/wp-json\/wp\/v2\/media?parent=1201"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/akc.com.co\/web\/wp-json\/wp\/v2\/categories?post=1201"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/akc.com.co\/web\/wp-json\/wp\/v2\/tags?post=1201"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}